the chain-reentrant shop with an exact time lag : new results karim Amrouche, M Boudhar, M Bendraouche, F Yalaoui International journal of production research, DOI : 10.1080/00207543.2016 …, 2016 | 19 | 2016 |
Two machines flow shop with reentrance and exact time lag KAM Boudhar RAIRO, operation research 50 (2), 223 - 232, 2016 | 19* | 2016 |
Two-machine chain-reentrant flow shop with the no-wait constraint K Amrouche, MBN Sami European Journal of Industrial Engineering 14 (4), 573-597, 2020 | 7 | 2020 |
Résolution d’un problème d’ordonnancement de type flowshop reentrant sans-attente K Amrouche, M Boudhar, M Bendraouche, F Yalaoui Roadef 2017, 2017 | 1 | 2017 |
Ordonnancement sur une ligne de production avec recirculation K Amrouche | 1 | 2016 |
The chain-reentrant shop with the no-wait constraint K Amrouche, M Boudhar, F Yalaoui IFAC-PapersOnLine 49 (12), 414-418, 2016 | 1 | 2016 |
A Multi start descent heuristic for a chain-reentrant shop FY Karim Amrouche, Mourad Boudhar Metaheuristic International conference, 2015 | 1* | 2015 |
Flow shop à deux machines avec recirculation K Amrouche Alger, 2010 | 1 | 2010 |
New efficient algorithms for the two-machine no-wait chain-reentrant shop problem N Sami, K Amrouche, M Boudhar Journal of Combinatorial Optimization 47 (5), 83, 2024 | | 2024 |
Reentrant open shop scheduling problem with time lags and no-wait constraints K Alioui, K Amrouche, M Boudhar Computers & Operations Research 166, 106595, 2024 | | 2024 |
Problème d’ordonnancement d’atelier de type chain-reentrant shop hybride avec tâches détériorables. K Amrouche, MBN Mohamed DIMACOS 2019, Conference on Discrete Mathematics and Computer Science, 50-53, 2019 | | 2019 |
2machine chain-reentrant shop with no-wait constraint N SAMI, K AMROUCHE, M BOUDHAR 9 ème édition du colloque Tendances dans les Applications Mathématiques en …, 2019 | | 2019 |
The two machines chain-reentrant shop with no-wait constraint :new results K Amrouche, N Sami, M Boudhar, M Bendraouche Tunisian Operational Research Society, 2018 | | 2018 |
Complexity results of a chain chain reentrante shop with an exact time lag K Amrouche, M Boudhar, F Yalaoui ORPA'2015: Operational Research Practice in Africa Conference 2015, 2015 | | 2015 |
Complexity results of a chain reentrante shop with an exact time lag FY Karim Amrouche, Mourad Boudhar Operation research practice in Africa, 2015 | | 2015 |
A metaheuristic for a chain reentrant shop with an exact time lag KAM Boudhar Conféerence Internationale sur la Conception et Production intégrées, 2013 | | 2013 |
A genetic algorithm for a chain-reentrant shops with an exact time lag MB Karim Amrouche 26th European Conference on Operational Research (EURO/INFORMS MMXIII),, 2013 | | 2013 |
TWO-AGENT SCHEDULING WITH TIME-DEPENDENT JOBS AND MAKESPAN AS CRITERION S NOURI, K AMROUCHE, M BOUDHAR | | |
NEAR-OPTIMAL METHODS FOR A CHAIN-REENTRANT HYBRID FLOW SHOP WITH TWO COMPETING AGENTS K AMROUCHE, N MOHAMED, M BOUDHAR | | |
JOURNÉES SCIENTIFIQUES DU LABORATOIRE RECITS (JSL’2016) H Boumediene | | |