Theo dõi
Sadoullah Ebrahimnejad
Sadoullah Ebrahimnejad
Associate Professor
Không có email được xác minh
Tiêu đề
Trích dẫn bởi
Trích dẫn bởi
Năm
Risk identification and assessment for build–operate–transfer projects: A fuzzy multi attribute decision making model
S Ebrahimnejad, SM Mousavi, H Seyrafianpour
Expert systems with Applications 37 (1), 575-586, 2010
2742010
A novel two-phase group decision making approach for construction project selection in a fuzzy environment
S Ebrahimnejad, SM Mousavi, R Tavakkoli-Moghaddam, H Hashemi, ...
Applied Mathematical Modelling 36 (9), 4197-4217, 2012
2142012
Emperor Penguins Colony: a new metaheuristic algorithm for optimization
S Harifi, M Khalilian, J Mohammadzadeh, S Ebrahimnejad
Evolutionary intelligence 12, 211-226, 2019
1902019
Giza Pyramids Construction: an ancient-inspired metaheuristic algorithm for optimization
S Harifi, J Mohammadzadeh, M Khalilian, S Ebrahimnejad
Evolutionary Intelligence 14 (4), 1743-1761, 2021
1482021
Multi-criteria decision making for plant location selection: an integrated Delphi–AHP–PROMETHEE methodology
SM Mousavi, R Tavakkoli-Moghaddam, M Heydar, S Ebrahimnejad
Arabian Journal for Science and Engineering 38, 1255-1268, 2013
1392013
Two meta-heuristics for three-stage assembly flowshop scheduling with sequence-dependent setup times
YM Sara Hatami, Sadoullah Ebrahimnejad,Reza Tavakkoli-Moghaddam
springer 50 (9), 1153-1164, 2010
81*2010
A bi-objective model of preventive maintenance planning in distributed systems considering vehicle routing problem
M Rashidnejad, S Ebrahimnejad, J Safari
Computers & Industrial Engineering 120, 360-381, 2018
802018
Soft computing-based preference selection index method for human resource management
B Vahdani, SM Mousavi, S Ebrahimnejad
Journal of Intelligent & Fuzzy Systems 26 (1), 393-403, 2014
782014
A novel hybrid MCDM approach for outsourcing supplier selection: A case study in pipe and fittings manufacturing
M Rezaeisaray, S Ebrahimnejad, K Khalili-Damghani
Journal of Modelling in Management 11 (2), 536-559, 2016
702016
An improved hybrid grey relational analysis approach for green resilient supply chain network assessment
A Malek, S Ebrahimnejad, R Tavakkoli-Moghaddam
Sustainability 9 (8), 1433, 2017
682017
A multi-stage decision-making process for multiple attributes analysis under an interval-valued fuzzy environment
SM Mousavi, B Vahdani, R Tavakkoli-Moghaddam, S Ebrahimnejad, ...
The International Journal of Advanced Manufacturing Technology 64, 1263-1273, 2013
522013
Scheduling of elective patients considering upstream and downstream units and emergency demand using robust optimization
A Moosavi, S Ebrahimnejad
Computers & Industrial Engineering 120, 216-233, 2018
512018
Incorporating location, routing, and inventory decisions in a bi-objective supply chain design problem with risk-pooling
R Tavakkoli-Moghaddam, F Forouzanfar, S Ebrahimnejad
Journal of Industrial Engineering International 9, 1-6, 2013
442013
Optimization in solving inventory control problem using nature inspired Emperor Penguins Colony algorithm
S Harifi, M Khalilian, J Mohammadzadeh, S Ebrahimnejad
Journal of Intelligent Manufacturing 32, 1361-1375, 2021
422021
A green vehicle routing problem with time windows considering the heterogeneous fleet of vehicles: two metaheuristic algorithms
N Rezaei, S Ebrahimnejad, A Moosavi, A Nikfarjam
European journal of industrial engineering 13 (4), 507-535, 2019
422019
Risk ranking in mega projects by fuzzy compromise approach: A comparative analysis
S Ebrahimnejad, SM Mousavi, R Tavakkoli-Moghaddam, M Heydar
Journal of Intelligent & Fuzzy Systems 26 (2), 949-959, 2014
422014
Optimizing a neuro-fuzzy system based on nature-inspired emperor penguins colony optimization algorithm
S Harifi, M Khalilian, J Mohammadzadeh, S Ebrahimnejad
IEEE Transactions on Fuzzy Systems 28 (6), 1110-1124, 2020
412020
Evaluating high risks in large-scale projects using an extended VIKOR method under a fuzzy environment
S Ebrahimnejad, SM Mousavi, R Tavakkoli-Moghaddam, M Heydar
International journal of industrial engineering computations 3 (3), 463-476, 2012
362012
Fuzzy bi-objective formulation for a parallel machine scheduling problem with machine eligibility restrictions and sequence-dependent setup times
M Naderi-Beni, E Ghobadian, S Ebrahimnejad, R Tavakkoli-Moghaddam
International Journal of Production Research 52 (19), 5799-5822, 2014
352014
A model for risk evaluation in construction projects based on fuzzy MADM
S Ebrahimnejad, SM Mousavi, SMH Mojtahedi
2008 4th IEEE International Conference on Management of Innovation and …, 2008
352008
Hệ thống không thể thực hiện thao tác ngay bây giờ. Hãy thử lại sau.
Bài viết 1–20