Emergency logistics planning in natural disasters L Özdamar, E Ekinci, B Küçükyazici Annals of operations research 129, 217-245, 2004 | 1254 | 2004 |
A dynamic logistics coordination model for evacuation and support in disaster response activities W Yi, L Özdamar European journal of operational research 179 (3), 1177-1193, 2007 | 1071 | 2007 |
An interactive approach for hierarchical analysis of helicopter logistics in disaster relief operations G Barbarosoğlu, L Özdamar, A Cevik European journal of operational research 140 (1), 118-133, 2002 | 654 | 2002 |
Models, solutions and enabling technologies in humanitarian logistics L Özdamar, MA Ertem European Journal of Operational Research 244 (1), 55-65, 2015 | 515 | 2015 |
A survey on the resource-constrained project scheduling problem L Özdamar, G Ulusoy IIE transactions 27 (5), 574-586, 1995 | 464 | 1995 |
A hierarchical clustering and routing procedure for large scale disaster relief logistics planning L Özdamar, O Demir Transportation Research Part E: Logistics and Transportation Review 48 (3 …, 2012 | 351 | 2012 |
A genetic algorithm approach to a general category project scheduling problem L Ozdamar IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and …, 1999 | 321 | 1999 |
Supply chain redesign in the healthcare industry of Singapore A Kumar, L Ozdamar, C Ning Zhang Supply Chain Management: An International Journal 13 (2), 95-103, 2008 | 224 | 2008 |
A mathematical model for post-disaster road restoration: Enabling accessibility and evacuation DT Aksu, L Ozdamar Transportation research part E: logistics and transportation review 61, 56-67, 2014 | 213 | 2014 |
Procurement performance measurement system in the health care industry A Kumar, L Ozdamar, C Peng Ng International journal of health care quality assurance 18 (2), 152-166, 2005 | 199 | 2005 |
Planning helicopter logistics in disaster relief L Ozdamar OR spectrum 33 (3), 655-672, 2011 | 181 | 2011 |
Heuristic performance and network/resource characteristics in resource-constrained project scheduling G Ulusoy, L Özdamar Journal of the operational research society 40 (12), 1145-1152, 1989 | 181 | 1989 |
A hierarchical planning approach for a production-distribution system L Ozdamar, T Yazgac International Journal of Production Research 37 (16), 3759-3772, 1999 | 133 | 1999 |
Parallel simulated annealing algorithms in global optimization E Onbaşoğlu, L Özdamar Journal of global optimization 19, 27-50, 2001 | 131 | 2001 |
Hybrid heuristics for the capacitated lot sizing and loading problem with setup times and overtime decisions L Özdamar, Şİ Birbil European Journal of Operational Research 110 (3), 525-547, 1998 | 129 | 1998 |
A local constraint based analysis approach to project scheduling under general resource constraints L Özdamar, G Ulusoy European Journal of Operational Research 79 (2), 287-298, 1994 | 124 | 1994 |
Greedy neighborhood search for disaster relief and evacuation logistics L Ozdamar, W Yi IEEE Intelligent Systems 23 (1), 14-23, 2008 | 117 | 2008 |
An integrated Lagrangean relaxation-simulated annealing approach to the multi-level multi-item capacitated lot sizing problem L Özdamar, G Barbarosoglu International Journal of production economics 68 (3), 319-331, 2000 | 116 | 2000 |
A hierarchical decision support system for production planning (with case study) L Özdamar, MA Bozyel, SI Birbil European Journal of Operational Research 104 (3), 403-422, 1998 | 113 | 1998 |
Coordinating debris cleanup operations in post disaster road networks L Özdamar, DT Aksu, B Ergüneş Socio-Economic Planning Sciences 48 (4), 249-262, 2014 | 111 | 2014 |