Följ
Peng Xu
Titel
Citeras av
Citeras av
År
Markov-based model for the prediction of railway track irregularities
L Bai, R Liu, Q Sun, F Wang, P Xu
Proceedings of the Institution of Mechanical Engineers, Part F: Journal of …, 2015
962015
A short-range prediction model for track quality index
P Xu, Q Sun, R Liu, F Wang
Proceedings of the Institution of Mechanical Engineers, Part F: Journal of …, 2011
602011
Establishment of track quality index standard recommendations for Beijing metro
RK Liu, P Xu, ZZ Sun, C Zou, QX Sun
Discrete dynamics in nature and society 2015 (1), 473830, 2015
592015
Dynamic-time-warping-based measurement data alignment model for condition-based railroad track maintenance
P Xu, R Liu, Q Sun, L Jiang
IEEE Transactions on Intelligent Transportation Systems 16 (2), 799-812, 2014
502014
Key equipment identification model for correcting milepost errors of track geometry data from track inspection cars
P Xu, QX Sun, RK Liu, FT Wang
Transportation Research Part C: Emerging Technologies 35, 85-103, 2013
412013
Optimizing the alignment of inspection data from track geometry cars
P Xu, Q Sun, R Liu, RR Souleyrette, F Wang
Computer‐Aided Civil and Infrastructure Engineering 30 (1), 19-35, 2015
402015
Research on a short-range prediction model for track irregularity over small track lengths
R Liu, P Xu, F Wang
Journal of Transportation Engineering 136 (12), 1085-1091, 2010
322010
Railroad track deterioration characteristics based track measurement data mining
P Xu, RK Liu, F Wang, FT Wang, QX Sun
Mathematical Problems in Engineering 2013 (1), 970573, 2013
292013
A novel description method for track irregularity evolution
P Xu, R Liu, F Wang, Q Sun, H Teng
International Journal of Computational Intelligence Systems 4 (6), 1358-1366, 2011
202011
Optimal match method for milepoint postprocessing of track condition data from subway track geometry cars
P Xu, Q Sun, R Liu, RR Souleyrette
Journal of Transportation Engineering 142 (8), 04016028, 2016
142016
Rail highway grade crossing roughness quantitative measurement using 3D technology
T Wang, RR Souleyrette, D Lau, P Xu
ASME/IEEE Joint Rail Conference 45356, V001T01A018, 2014
132014
A novel short‐range prediction model for railway track irregularity
P Xu, R Liu, Q Sun, F Wang
Discrete Dynamics in Nature and Society 2012 (1), 591490, 2012
122012
Developing an Enhanced Short‐Range Railroad Track Condition Prediction Model for Optimal Maintenance Scheduling
P Xu, C Jia, Y Li, Q Sun, R Liu
Mathematical Problems in Engineering 2015 (1), 796171, 2015
102015
A tailored branch-and-bound algorithm for routing a metro track inspection vehicle
L Chen, P Xu, YQ Yang
Engineering Optimization 55 (6), 1040-1059, 2023
82023
A stochastic model for the estimation of renewal periods of sharply curved metro rails
W Bai, R Liu, Q Sun, F Wang, P Xu
Proceedings of the Institution of Mechanical Engineers, Part F: Journal of …, 2018
82018
Recursive Hybrid Heuristic Algorithm for Routing a Track-Geometry Car through a Large-Scale Urban Subway Network
RT Yang, P Xu*, L Chen, YQ Yang
Journal of Transportation Engineering, Part A: Systems 146 (8), 2020
52020
Developing a Calibration Method for Tactile Pressure Sensors Applied to Non-Uniform, Rough Contact Surfaces: A Case Study at the Ballast-Tie Interface of Railroad Track
M McHenry, P Xu, TJ Greenwell, RR Souleyrette, JG Rose
Transportation Research Board 93rd Annual MeetingTransportation Research Board, 2014
42014
Local-ideal-points based autonomous space decomposition framework for the multi-objective periodic generalized directed rural postman problem under length restrictions with …
L Chen, P Xu, X Yan, RR Souleyrette, TA Wang
Computers & Operations Research 150, 106052, 2023
32023
BIC-based data-driven rail track deterioration adaptive piecewise modeling framework
Y Yang, P Xu, G Yang, L Chen, J Li
Frontiers in Materials 8, 620484, 2021
32021
适用复杂劣化趋势的轨道不平顺鲁棒建模方法
杨雅琴, 徐鹏, 李晔, 孙全欣
交通运输系统工程与信息 20 (5), 156-162, 2020
3*2020
Systemet kan inte utföra åtgärden just nu. Försök igen senare.
Artiklar 1–20