Прати
Bryce Littlejohn
Bryce Littlejohn
Associate Professor of Physics
Верификована је имејл адреса на iit.edu
Наслов
Навело
Навело
Година
Observation of electron-antineutrino disappearance at Daya Bay
FP An, JZ Bai, AB Balantekin, HR Band, D Beavis, W Beriguete, M Bishai, ...
Physical Review Letters 108 (17), 171803, 2012
34622012
Improved measurement of electron antineutrino disappearance at Daya Bay
FP An, Q An, JZ Bai, AB Balantekin, HR Band, W Beriguete, M Bishai, ...
Chinese Physics C 37 (1), 011001, 2013
5412013
Design and construction of the MicroBooNE detector
R Acciarri, C Adams, R An, A Aparicio, S Aponte, J Asaadi, M Auger, ...
Journal of Instrumentation 12 (02), P02017, 2017
5262017
Long-baseline neutrino facility (LBNF) and deep underground neutrino experiment (DUNE) conceptual design report, volume 4 the DUNE detectors at LBNF
R Acciarri, MA Acero, M Adamowski, C Adams, P Adamson, S Adhikari, ...
arXiv preprint arXiv:1601.02984, 2016
5132016
Spectral measurement of electron antineutrino oscillation amplitude and frequency at Daya Bay
FP An, AB Balantekin, HR Band, W Beriguete, M Bishai, S Blyth, ...
Physical review letters 112 (6), 061801, 2014
4582014
Volume I. introduction to DUNE
B Abi, R Acciarri, MA Acero, G Adamov, D Adams, M Adinolfi, Z Ahmad, ...
Journal of instrumentation 15 (08), T08008, 2020
4532020
Deep underground neutrino experiment (DUNE), far detector technical design report, volume II: DUNE physics
B Abi, R Acciarri, MA Acero, G Adamov, D Adams, M Adinolfi, Z Ahmad, ...
arXiv preprint arXiv:2002.03005, 2020
3602020
Measurement of the reactor antineutrino flux and spectrum at Daya Bay
FP An, AB Balantekin, HR Band, M Bishai, S Blyth, I Butorov, D Cao, ...
Physical review letters 116 (6), 061801, 2016
3492016
Long-baseline neutrino oscillation physics potential of the DUNE experiment
B Abi, R Acciarri, MA Acero, G Adamov, D Adams, M Adinolfi, Z Ahmad, ...
The European Physical Journal C 80 (10), 1-34, 2020
3472020
Measurement of electron antineutrino oscillation based on 1230 days of operation of the Daya Bay experiment
FP An, AB Balantekin, HR Band, M Bishai, S Blyth, D Cao, GF Cao, J Cao, ...
Physical Review D 95 (7), 072006, 2017
3452017
Long-baseline neutrino facility (LBNF) and deep underground neutrino experiment (DUNE): Volume 1: The LBNF and DUNE projects
R Acciarri, S Bansal, A Friedland, Z Djurcic, L Rakotondravohitra, T Xin, ...
3442016
Measurement of the electron antineutrino oscillation with 1958 days of operation at Daya Bay
D Adey, FP An, AB Balantekin, HR Band, M Bishai, S Blyth, D Cao, ...
Physical review letters 121 (24), 241805, 2018
3372018
New measurement of antineutrino oscillation with the full detector configuration at Daya Bay
FP An, AB Balantekin, HR Band, M Bishai, S Blyth, I Butorov, GF Cao, ...
Physical review letters 115 (11), 111802, 2015
3162015
A proposal for a three detector short-baseline neutrino oscillation program in the Fermilab booster neutrino beam
R Acciarri, C Adams, R An, C Andreopoulos, AM Ankowski, M Antonello, ...
TBD, 2015
3162015
Evolution of the reactor antineutrino flux and spectrum at Daya Bay
FP An, AB Balantekin, HR Band, M Bishai, S Blyth, D Cao, GF Cao, J Cao, ...
Physical review letters 118 (25), 251801, 2017
2742017
Fundamental physics at the intensity frontier
JL Hewett, H Weerts, R Brock, JN Butler, BCK Casey, J Collar, ...
arXiv preprint arXiv:1205.2671, 2012
2482012
Improved measurement of the reactor antineutrino flux and spectrum at Daya Bay
FP An, AB Balantekin, HR Band, M Bishai, S Blyth, D Cao, GF Cao, J Cao, ...
Chinese Physics C 41 (1), 013002, 2017
2452017
The Pandora multi-algorithm approach to automated pattern recognition of cosmic-ray muon and neutrino events in the MicroBooNE detector
R Acciarri, C Adams, R An, J Anthony, J Asaadi, M Auger, L Bagby, ...
The European Physical Journal C 78 (1), 1-25, 2018
2372018
Deep underground neutrino experiment (DUNE) near detector conceptual design report
AA Abud, B Abi, R Acciarri, MA Acero, G Adamov, D Adams, M Adinolfi, ...
Instruments 5 (4), 31, 2021
2342021
The DUNE far detector interim design report volume 1: physics, technology and strategies
B Abi, R Acciarri, MA Acero, M Adamowski, C Adams, D Adams, ...
arXiv preprint arXiv:1807.10334, 2018
2302018
Систем тренутно не може да изврши ову радњу. Пробајте поново касније.
Чланци 1–20