Spremljaj
Peter Tavner
Peter Tavner
Emeritus Professor, DSc, FIET, Eur Ing, Durham University, Department of Engineering
Preverjeni e-poštni naslov na durham.ac.uk - Domača stran
Naslov
Navedeno
Navedeno
Leto
An industry-based survey of reliability in power electronic converters
S Yang, A Bryant, P Mawby, D Xiang, L Ran, PJ Tavner
IEEE Transactions on Industry Applications 47 (3), 1441-1451, 2011
23642011
Comparison of direct-drive and geared generator concepts for wind turbines
H Polinder, FFA Van der Pijl, GJ De Vilder, PJ Tavner
IEEE Transactions on energy conversion 21 (3), 725-733, 2006
17182006
Condition monitoring for device reliability in power electronic converters: a review
S Yang, D Xiang, A Bryant, P Mawby, L Ran, PJ Tavner
IEEE Transactions on Power Electronics 25 (11), 2734-2752, 2010
14252010
Condition Monitoring of Rotating Electrical Machines, 3rd Ed., Energy Engineering, #1.
PJ Tavner, L Ran, CJ Crabtree
The Institution of Engineering and Technology, 2020
1041*2020
Control of a doubly fed induction generator in a wind turbine during grid fault ride-through
D Xiang, L Ran, PJ Tavner, S Yang
IEEE Transactions on Energy Conversion 21 (3), 652-662, 2006
9262006
Reliability of wind turbine subassemblies
F Spinato, PJ Tavner, GJW Van Bussel, E Koutoulakos
IET Proceedings Renewable Power Generation 3 (4), 387-401, 2009
9002009
Reliability analysis for wind turbines
PJ Tavner, J Xiang, F Spinato
Wind Energy: An International Journal for Progress and Applications in Wind …, 2007
7302007
Failure modes and effects analysis (FMEA) for wind turbines
H Arabian-Hoseynabadi, H Oraee, PJ Tavner
International journal of electrical power & energy systems 32 (7), 817-824, 2010
6932010
Review of condition monitoring of rotating electrical machines
PJ Tavner
IET Electric Power Applications 2 (4), 215-247, 2008
6932008
Wind turbine condition monitoring: technical and commercial challenges
W Yang, PJ Tavner, CJ Crabtree, Y Feng, Y Qiu
Wind Energy 17 (5), 673–693, 2012
5992012
Cost-effective condition monitoring for wind turbines
W Yang, PJ Tavner, CJ Crabtree, M Wilkinson
IEEE Transactions on Industrial Electronics 57 (1), 263-271, 2010
4842010
Wind turbine downtime and its importance for offshore deployment
S Faulstich, B Hahn, PJ Tavner
Wind Energy 14 (3), 327-337, 2011
4822011
Performance of BDFM as generator and motor
RA McMahon, PC Roberts, X Wang, PJ Tavner
IEE Proceedings, Part B, Electric Power Applications 153 (2), 289-299, 2006
3992006
Offshore Wind Power: Reliability, Availability & Maintenance, 2nd Ed., Energy Engineering, #8.
PJ Tavner
The Institution of Engineering and Technology, 2021
372*2021
Long-term Research Challenges in Wind Energy, A Research Agenda, #6.
JP (Contribs) G van Bussel J Sorensen P Tavner (Eds) G Van Kuik
Long-term research challenges in wind energy–a research agenda by the …, 2016
332*2016
Monitoring wind turbine gearboxes
Y Feng, Y Qiu, CJ Crabtree, H Long, PJ Tavner
Wind Energy 16 (5), 728–740, 2012
3272012
Condition monitoring of the power output of wind turbine generators using wavelets
SJ Watson, BJ Xiang, W Yang, PJ Tavner, CJ Crabtree
IEEE Transactions on Energy Conversion 25 (3), 715-721, 2010
2842010
Investigation into IGBT dV/dt during turn-off and its temperature dependence
A Bryant, S Yang, P Mawby, D Xiang, L Ran, PJ Tavner, P Palmer
IEEE Transactions on Power Electronics 26 (10), 3019-3031, 2011
2702011
A multilevel modular converter for a large, light weight wind turbine generator
CH Ng, MA Parker, L Ran, PJ Tavner, JR Bumby, E Spooner
IEEE Transactions on Power Electronics 23 (3), 1062-1074, 2008
2682008
Equivalent circuit for the brushless doubly fed machine (BDFM) including parameter estimation and experimental verification
PC Roberts, RA McMahon, PJ Tavner, JM Maciejowski, TJ Flack
IEE Proceedings, Part B, Electric Power Applications 152 (4), 933-942, 2005
2572005
Sistem trenutno ne more izvesti postopka. Poskusite znova pozneje.
Članki 1–20