Whole life performance assessment: Critical success factors SH Park Journal of construction engineering and management 135 (11), 1146-1161, 2009 | 147 | 2009 |
Sustainable refurbishment for school buildings: a literature review ATH Le, KS Park, N Domingo, E Rasheed, N Mithraratne International Journal of Building Pathology and Adaptation 39 (1), 5-19, 2021 | 57 | 2021 |
BIM feasibility study for housing refurbishment projects in the UK KP Kim, KS Park Organization, technology & management in construction: an international …, 2013 | 39 | 2013 |
Critical success factors for implementing integrated construction project delivery SW Whang, KS Park, S Kim Engineering, construction and architectural management 26 (10), 2432-2446, 2019 | 38 | 2019 |
Essential BIM input data study for housing refurbishment: homeowners’ preferences in the UK KS Park, KP Kim Buildings 4 (3), 467-487, 2014 | 36 | 2014 |
Enhancing off-site manufacturing through early contractor involvement (ECI) in New Zealand D Finnie, NA Ali, K Park Proceedings of the Institution of Civil Engineers-Management, Procurement …, 2018 | 33 | 2018 |
Earthquake damage estimation systems: Literature review K Kahandawa, ND Domingo, KS Park, SR Uma Procedia engineering 212, 622-628, 2018 | 32 | 2018 |
Why are older inner-city buildings vacant? Implications for town centre regeneration I Esther Yakubu, T Egbelakin, D Dizhur, J Ingham, K Sungho Park, ... Journal of Urban Regeneration & Renewal 11 (1), 44-59, 2017 | 31 | 2017 |
Housing information modelling for BIM-embedded housing refurbishment KP Kim, KS Park Journal of Facilities Management 16 (3), 299-314, 2018 | 29 | 2018 |
BUILDING MAINTENANCE COST PLANNING AND ESTIMATING: A LITERATURE REVIEW ATH Le, N Domingo, E Rasheed, KS Park 34th Annual ARCOM Conference, 3-5 September 2018, Belfast, UK, Association …, 2018 | 25 | 2018 |
Implication of quantity surveying practice in a BIM-enabled environment KP Kim, KS Park Pacific association of quantity surveyors congress, 1-11, 2016 | 20 | 2016 |
Innovative use of vodcast (Video-Podcast) to Enrich learning experience in structures laboratory P Mann, D Wong, KS Park 4th International Conference on e-Learning, ICEL 2009, 354-361, 2009 | 18 | 2009 |
Comparative analysis of the BIM status in the UK and US for improving the efficiency of construction project management process in Korea KP Kim, S Park Project Management Review 2 (2), 1-16, 2012 | 15 | 2012 |
Delivering value for money with BIM-embedded housing refurbishment KP Kim, KS Park Facilities 36 (13/14), 657-675, 2018 | 14 | 2018 |
BIM application and adoption in the UK housing sector K Park, K Kim Integrated Building Information Modelling, 46-81, 2017 | 14 | 2017 |
Maturity model of building maintenance management for New Zealand’s state schools ATH Le, N Domingo, E Rasheed, K Park Building Research & Information 50 (4), 438-451, 2022 | 13 | 2022 |
Implementing a strategy of reliability centered maintenance (RCM) in the Libyan cement industry KM Albarkoly, KS Park International Journal of Science and Engineering Investigations 4 (7), 51-60, 2015 | 13 | 2015 |
Primary BIM dataset for refurbishing flood risk vulnerable housing in the UK KP Kim, KS Park Built Environment Project and Asset Management 6 (4), 365-378, 2016 | 12 | 2016 |
BIM education: case New Zealand T Puolitaival, T Booth, A GhaffarianHoseini, KS Park | 11 | 2017 |
Strategic collaboration in managing existing buildings in New Zealand's state schools: school managers' perspectives ATH Le, N Domingo, E Rasheed, K Park Construction management and economics 40 (3), 173-185, 2022 | 10 | 2022 |