Подписаться
V. Jorge Leon
V. Jorge Leon
Подтвержден адрес электронной почты в домене tamu.edu
Название
Процитировано
Процитировано
Год
Robustness measures and robust scheduling for job shops
V Jorge Leon, S David Wu, RH Storer
IIE transactions 26 (5), 32-43, 1994
5501994
An arc cover–path-cover formulation and strategic analysis of alternative-fuel station locations
I Capar, M Kuby, VJ Leon, YJ Tsai
European Journal of Operational Research 227 (1), 142-151, 2013
2662013
Machine scheduling with a rate-modifying activity
CY Lee, VJ Leon
European Journal of Operational Research 128 (1), 119-128, 2001
2302001
Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling
VJ Leon, R Balakrishnan
Operations-Research-Spektrum 17, 173-182, 1995
1761995
An adaptable problem-space-based search method for flexible flow line scheduling
VJ Leon, B Ramamoorthy
IIE transactions 29 (2), 115-125, 1997
751997
Integrated decision-support system for diagnosis, maintenance planning, and scheduling of manufacturing systems
IJ Jeong, VJ Leon, JR Villalobos
International Journal of Production Research 45 (2), 267-285, 2007
722007
Replanning and analysis of partial setup strategies in printed circuit board assembly systems
VJ Leon, BA Peters
International Journal of Flexible Manufacturing Systems 8, 389-411, 1996
641996
A comparison of setup strategies for printed circuit board assembly
VJ Leon, BA Peters
Computers & Industrial Engineering 34 (1), 219-234, 1998
601998
On scheduling with ready‐times, due‐dates and vacations
VJ Leon, SD Wu
Naval Research Logistics (NRL) 39 (1), 53-65, 1992
581992
Single-vendor multi-buyer inventory coordination under private information
CL Chu, VJ Leon
European Journal of Operational Research 191 (2), 485-503, 2008
532008
A game-theoretic control approach for job shops in the presence of disruptions
VJ Leon, SD Wu, RH Storer
THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 32 (6), 1451-1476, 1994
531994
A serial supply chain of newsvendor problem with safety stocks under complete and partial information sharing
IJ Jeong, VJ Leon
International Journal of Production Economics 135 (1), 412-419, 2012
492012
Decision-making and cooperative interaction via coupling agents in organizationally distributed systems
IJ Jeong, VJ Leon
Iie Transactions 34 (9), 789-802, 2002
472002
Scheduling with product family set-up times: an application in TFT LCD manufacturing
HJ Shin*, VJ Leon
International journal of production research 42 (20), 4235-4248, 2004
442004
Manufacturing education and research at Texas A&M University: Responding to global trends
WNP Hung, VJ Leon
Journal of Manufacturing Systems 24 (3), 153-161, 2005
372005
Global engineering: design, decision making, and communication
C Acosta, VJ Leon, CR Conrad, CO Malave
CRC Press, 2009
322009
Scalable methodology for supply chain inventory coordination with private information
CL Chu, VJ Leon
European Journal of Operational Research 195 (1), 262-279, 2009
292009
Power-of-two single-warehouse multi-buyer inventory coordination with private information
CL Chu, VJ Leon
International Journal of Production Economics 111 (2), 562-574, 2008
282008
Single-machine rework rescheduling to minimize maximum waiting-times with fixed sequence of jobs and ready times
Y Guo, M Huang, Q Wang, VJ Leon
Computers & industrial engineering 91, 262-273, 2016
262016
Robustness methodology to aid multiobjective decision making in the electricity generation capacity expansion problem to minimize cost and water withdrawal
D Jornada, VJ Leon
Applied energy 162, 1089-1108, 2016
252016
В данный момент система не может выполнить эту операцию. Повторите попытку позднее.
Статьи 1–20