Seguir
Craig Dubler
Craig Dubler
Professor of Practice, Architectural Engineering, Penn State University
Email confirmado em PSU.EDU
Título
Citado por
Citado por
Ano
Determining the frequency and impact of applying BIM for different purposes on projects
R Kreider, J Messner, C Dubler
Proceedings of the 6th international conference on innovation in …, 2010
1422010
BIM project execution planning guide
J Messner, C Anumba, C Dubler, S Goodman, C Kasprzak
Computer Integrated Construction Program, Penn State, 2019
662019
The benefits of BIM integration with facilities management: A preliminary case study
S Terreno, CJ Anumba, E Gannon, C Dubler
Computing in Civil Engineering 2015, 675-683, 2015
592015
Aligning BIM with FM: streamlining the process for future projects
C Kasprzak, C Dubler
Australasian Journal of Construction Economics and Building, The 12 (4), 68-77, 2012
502012
Developing standards to assess the quality of BIM criteria for facilities management
C Kasprzak, A Ramesh, C Dubler
AEI 2013: Building Solutions for Architectural Engineering, 680-690, 2013
292013
Using lean theory to identify waste associated with information exchanges on a building project
CR Dubler, JI Messner, CJ Anumba
Construction Research Congress 2010: Innovation for Reshaping Construction …, 2010
242010
BIM-based management of building operations
S Terreno, CJ Anumba, C Dubler
Construction Research Congress 2016, 1855-1865, 2016
212016
BIM project execution planning guide—Version 2.0
C Anumba, C Dubler, S Goodman, C Kasprzak, R Kreider, J Messner, ...
Computer Integrated Construction Research Program, Pennsylvania State …, 2010
182010
BIM project execution planning guide (V. 2.2)
J Messner, C Anumba, C Dubler, S Goodman, C Kasprzak, R Kreider, ...
Computer Integrated Construction Research Program, Pennsylvania State University, 2019
162019
BIM Project Execution Planning Guide, Version 2.2. Computer Integrated Construction Research Program, The Pennsylvania State University, University Park, Pennsylvania, 2019
J Messner, C Anumba, C Dubler, S Goodman, C Kasprzak, R Kreider, ...
ISBN 978-1-62307-006-9, 0
15
The BIM project execution planning guide and templates—version 2.0
C Anumba, C Dubler, S Goodman, C Kasprzak, R Kreider, J Messner, ...
CIC Research Group, Department of Architectural Engineering, The …, 2010
142010
Computer Integrated Construction Research Program
J Messner, C Anumba, C Dubler, S Goodman, C Kasprzak, R Kreider, ...
BIM Project Execution Planning Guide–Version 2, 127, 2011
122011
Defining a taxonomy for virtual 3D city model use cases with a focus on facility asset management—a virtual campus case study
Z Jiang, JI Messner, CR Dubler
Computing in Civil Engineering 2017, 43-50, 2017
92017
Building information modelling execution planning guide
C Anumba, C Dubler, S Goodman, C Kasprzak, R Kreider, J Messner, ...
The Computer Integrated Construction Research Group, The Pennsylvania State …, 2009
82009
BIM project execution planning guide and templates: version 2.0
J Messner, C Anumba, C Dubler, S Goodman, C Kasprzak, R Kreider, ...
62011
Current Trends and Future of Advanced Simulations in Facility Management—An Owner’s Perspective
Z Ghorbani, C Dubler
Canadian Society of Civil Engineering Annual Conference, 441-452, 2021
42021
An artificially intelligent battleship player utilizing adaptive firing and placement strategies
JG Bridon, ZA Correll, CR Dubler, ZK Gotsch
The Pennsylvania State University, State College, PA 16802, 2009
42009
Developing a Standard Energy Auditing Process for Pennsylvania State University
T Sprau Coulter, CR Dubler, RM Leicht
AEI 2013: Building Solutions for Architectural Engineering, 891-901, 2013
32013
Evaluating waste associated with building information exchange using lean theory
CR Dubler
32011
Evaluating Facility Asset Information Needs in a Common Data Environment to Support Maintenance Workers
Z Ghorbani, R Napolitano, C Dubler, J Messner
Construction Research Congress 2022, 1184-1190, 2022
22022
O sistema não pode efectuar a operação agora. Tente mais tarde.
Artigos 1–20