Seguir
yasuki sekiguchi
yasuki sekiguchi
Email confirmado em econ.hokudai.ac.jp
Título
Citado por
Citado por
Ano
Optimal schedule in a GT-type flow-shop under series-parallel precedence constraints
Y Sekiguchi
Journal of the Operations Research Society of Japan 26 (3), 226-252, 1983
311983
A note on node packing polytopes on hypergraphs
Y Sekiguchi
Operations Research Letters 2 (5), 243-247, 1983
141983
A Unifying Framework of Combinatorial Optimization Algorithms: Tree Programming and its Validity
Y Sekiguchi
Journal of the Operations Research Society of Japan 24 (1), 67-94, 1981
61981
Inter-and intra-group-of-jobs schedule for minimizing makespan in a two-machine GT shop
Y Sekiguchi
IFAC Proceedings Volumes 14 (2), 2021-2026, 1981
41981
The DSS architecture based on non-mathematical problems specification and model/solver independence
T Mukohara, Y Sekiguchi
Operations Research/Management Science at Work, 281-298, 2002
32002
A decomposition theory based on a dominance relation and composite jobs
Y Sekiguchi
Discrete applied mathematics 17 (1-2), 187-211, 1987
31987
Factory automation in Japan
Y Sekiguchi
Innovations in Management—The Japanese Corporation, 1985
31985
A flexible and unifying approach to sequencing problems in two-machine flow shops and job shops
Y SEKIGUCHI
Advanced Manufacturing Processes, Systems, and Technologies (AMPST'96), 569-578, 1996
21996
Approach to legislation for ethical uses of AI artefacts in practice
Y Sekiguchi
Societal Challenges in the Smart Society, 337-348, 2020
12020
Optimal schedules under series-parallel precedence constraints
Y SEKIGUCHI
Hokudai Economic Papers 13, 100-115, 1983
11983
Flow shop and analysis of the schedules
Y SEKIGUCHI, S KOYAMA, R MIURA
Transactions of the Society of Instrument and Control Engineers 8 (5), 552-560, 1972
11972
Preface on Special Issue on Advanced Planning and Scheduling for Supply Chain Management (< Special Issue> Advanced Planning and Scheduling for Supply Chain Management)
N Katoh, H Kise, T Tamura, S Masuyama, H Morita, Y Sekiguchi, ...
Journal of the Operations Research Society of Japan 49 (3), 151, 2006
2006
Scheduling Problems Specification by Extending Entity-Relationship Concepts: Characteristics and Applications
T Mukohara, Y Sekiguchi, J Bao
2005
3B2 A PROCEDURE FOR PREPARING PROBLEM SPECIFICATIONS IN THE GERM FORMAT (Technical session 3B: Combinatorics 2)
Y Sekiguchi, T Mukohara
Proceedings of International Symposium on Scheduling 2004, 131-134, 2004
2004
Fundamental Theory of Scheduling and Its Applications-VI-Stochastic Scheduling Problems
H Kise, Y Sekiguchi
SYSTEMS CONTROL AND INFORMATION 45 (6), 342-349, 2001
2001
Fundamental Theory of Scheduling and Its Applications-IV Branch and Bound Methods for Scheduling Problems
Y Sekiguchi, H Kise
SYSTEMS CONTROL AND INFORMATION 45 (2), 97-104, 2001
2001
Fundamental Theory of Scheduling and It's Applications-I-Basic Mathematics of Sequencing
Y Sekiguchi, H Kise
SYSTEMS CONTROL AND INFORMATION 44 (8), 468-475, 2000
2000
Fundamental Theory of Scheduling and Its Applications-III-Fundamental Scheduling Algorithms
Y Sekiguchi, H Kise
SYSTEMS CONTROL AND INFORMATION 44 (12), 723-731, 2000
2000
Fundamental Theory of Scheduling and Its Applications-II-Job Shop Problem and Its Computational Complexity
H Kise, Y Sekiguchi
SYSTEMS CONTROL AND INFORMATION 44 (10), 601-608, 2000
2000
Computer-based environments for operations research: Classification and a pioneer system
Y Sekiguchi
International Transactions in Operational Research 1 (4), 423-434, 1994
1994
O sistema não pode efectuar a operação agora. Tente mais tarde.
Artigos 1–20