Seguir
Rizos Sakellariou
Rizos Sakellariou
University of Manchester, Department of Computer Science
Email confirmado em cs.man.ac.uk - Página inicial
Título
Citado por
Citado por
Ano
AI for next generation computing: Emerging trends and future directions
SS Gill, M Xu, C Ottaviani, P Patros, R Bahsoon, A Shaghaghi, M Golec, ...
Internet of Things 19, 100514, 2022
5502022
A hybrid heuristic for DAG scheduling on heterogeneous systems
R Sakellariou, H Zhao
18th International Parallel and Distributed Processing Symposium, 2004 …, 2004
4272004
The internet of things, fog and cloud continuum: Integration and challenges
L Bittencourt, R Immich, R Sakellariou, N Fonseca, E Madeira, M Curado, ...
Internet of Things 3, 134-155, 2018
3952018
A taxonomy of grid monitoring systems
S Zanikolas, R Sakellariou
Future Generation Computer Systems 21 (1), 163-188, 2005
3742005
Scheduling Workflows with Budget Constraints
R Sakellariou, H Zhao, E Tsiakkouri, MD Dikaiakos
Integrated Research in Grid Computing, CoreGrid series, Springer-Verlag, 2007
3682007
Transformative effects of ChatGPT on modern education: Emerging Era of AI Chatbots
SS Gill, M Xu, P Patros, H Wu, R Kaur, K Kaur, S Fuller, M Singh, P Arora, ...
Internet of Things and Cyber-Physical Systems 4, 19-23, 2024
3542024
DAG scheduling using a lookahead variant of the heterogeneous earliest finish time algorithm
LF Bittencourt, R Sakellariou, ERM Madeira
Parallel, Distributed and Network-Based Processing (PDP), 2010 18th …, 2010
3192010
Scheduling multiple DAGs onto heterogeneous systems
H Zhao, R Sakellariou
Proceedings 20th IEEE International Parallel & Distributed Processing …, 2006
3182006
Scheduling data-intensive workflows onto storage-constrained distributed resources
A Ramakrishnan, G Singh, H Zhao, E Deelman, R Sakellariou, K Vahi, ...
Cluster Computing and the Grid, 2007. CCGRID 2007. Seventh IEEE …, 2007
2052007
An experimental investigation into the rank function of the heterogeneous earliest finish time scheduling algorithm
H Zhao, R Sakellariou
Euro-Par 2003 Parallel Processing: 9th International Euro-Par Conference …, 2003
1942003
Comparative evaluation of the robustness of DAG scheduling heuristics
LC Canon, E Jeannot, R Sakellariou, W Zheng
Grid Computing, 73-84, 2008
1882008
A low-cost rescheduling policy for efficient mapping of workflows on grid systems
R Sakellariou, H Zhao
Scientific Programming 12 (4), 253-262, 2004
1852004
A characterization of workflow management systems for extreme-scale applications
RF Da Silva, R Filgueira, I Pietri, M Jiang, R Sakellariou, E Deelman
Future Generation Computer Systems 75, 228-238, 2017
1722017
Budget-deadline constrained workflow planning for admission control
W Zheng, R Sakellariou
Journal of grid computing 11 (4), 633-651, 2013
1702013
Distributed query processing on the grid
J Smith, A Gounaris, P Watson, NW Paton, AAA Fernandes, R Sakellariou
Grid Computing—GRID 2002: Third International Workshop Baltimore, MD, USA …, 2002
1552002
Adaptive resource configuration for Cloud infrastructure management
M Maurer, I Brandic, R Sakellariou
Future Generation Computer Systems 29 (2), 472-487, 2013
1392013
POEMS: End-to-end performance design of large parallel adaptive computational systems
VS Adve, R Bagrodia, JC Browne, E Deelman, A Dube, EN Houstis, ...
IEEE transactions on Software Engineering 26 (11), 1027-1048, 2000
1392000
Mapping virtual machines onto physical machines in cloud computing: A survey
I Pietri, R Sakellariou
ACM Computing Surveys (CSUR) 49 (3), 1-30, 2016
1372016
Predictable performance in SMT processors: Synergy between the OS and SMTs
FJ Cazorla, PMW Knijnenburg, R Sakellariou, E Fernandez, A Ramirez, ...
IEEE Transactions on Computers 55 (7), 785-799, 2006
1302006
Scheduling in distributed systems: A cloud computing perspective
LF Bittencourt, A Goldman, ERM Madeira, NLS da Fonseca, R Sakellariou
Computer science review 30, 31-54, 2018
1262018
O sistema não pode efectuar a operação agora. Tente mais tarde.
Artigos 1–20