Obserwuj
mahdi karbasian
mahdi karbasian
associate professor of Industrial Engineering, MUT
Zweryfikowany adres z mut-es.ac.ir
Tytuł
Cytowane przez
Cytowane przez
Rok
The application of ISM model in evaluating agile suppliers selection criteria and ranking suppliers using fuzzy TOPSIS-AHP methods
Y Beikkhakhian, M Javanmardi, M Karbasian, B Khayambashi
Expert systems with Applications 42 (15-16), 6224-6236, 2015
2812015
Optimizing nano-silver formation by Fusarium oxysporum PTCC 5115 employing response surface methodology.
M Karbasian, SM Atyabi, SD Siadat, SB Momen, D Norouzian
1052008
Reliability optimization of series-parallel systems with K-mixed redundancy strategy
A Peiravi, M Karbasian, MA Ardakan, DW Coit
Reliability Engineering & System Safety 183, 17-28, 2019
882019
A fuzzy case based reasoning approach to value engineering
MHF Zarandi, ZS Razaee, M Karbasian
Expert Systems with Applications 38 (8), 9334-9339, 2011
572011
A PCA-DEA method for organizational performance evaluation based on intellectual capital and employee loyalty: A case study
K Rahimpour, H Shirouyehzad, M Asadpour, M Karbasian
Journal of Modelling in Management 15 (4), 1479-1513, 2020
532020
Interval type-2 fuzzy expert system for prediction of carbon monoxide concentration in mega-cities
MHF Zarandi, MR Faraji, M Karbasian
Applied soft computing 12 (1), 291-301, 2012
482012
K-mixed strategy: A new redundancy strategy for reliability problems
A Peiravi, M Karbasian, M Abouei Ardakan
Proceedings of the Institution of Mechanical Engineers, Part O: Journal of …, 2018
432018
An exponential cluster validity index for fuzzy clustering with crisp and fuzzy data
ZMH FAZEL, MR Faraji, M Karbasian
SCIENTIA IRANICA 17 (2), 95-110, 2010
422010
An EWMA t chart with variable sampling intervals for monitoring the process mean
RB Kazemzadeh, M Karbasian, MA Babakhani
The International Journal of Advanced Manufacturing Technology 66, 125-139, 2013
332013
Evaluation and selection of supplier in supply chain with fuzzy analytical network process approach
M Ghasempoor Anaraki, DS Vladislav, M Karbasian, N Osintsev, V Nozick
Journal of fuzzy extension and applications 2 (1), 69-88, 2021
282021
A hybrid reliability-centered maintenance approach for mining transportation machines: a real case in Esfahan
R Jafarpisheh, M Karbasian, M Asadpour
International Journal of Quality & Reliability Management 38 (7), 1550-1575, 2021
252021
Preparation and evaluation of a new lipopolysaccharide-based conjugate as a vaccine candidate for brucellosis
SD Siadat, F Vaziri, M Eftekhary, M Karbasian, A Moshiri, ...
Osong public health and research perspectives 6 (1), 9-13, 2015
192015
Improving Decision-Making Grid based on interdependence among failures with a case study in the steel industry
A Shahin, A Labib, S Emami, M Karbasian
The TQM journal 31 (2), 167-182, 2018
182018
Evaluating MTTF of 2-out-of-3 redundant systems with common cause failure and load share based on alpha factor and capacity flow models
SM Mortazavi, M Karbasian, S Goli
International Journal of System Assurance Engineering and Management 8, 542-552, 2017
172017
Optimization of Brucella abortus S99 Lipopolysaccharide extraction by phenol and butanol methods.
AS Salmani, SD Siadat, D Norouzian, H Ahmadi, M Nejati, B Tabaraie, ...
162008
Presenting a productive and sustainable model of integrated management system for achieving an added value in organisational processes
MHK Gavareshki, M Abbasi, M Karbasian, R Rostamkhani
International Journal of Productivity and Quality Management 30 (4), 429-461, 2020
152020
Estimation of parameters of the power-law-non-homogenous poisson process in the case of exact failures data
M Karbasian, Z Ibrahim
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION RESEARCH …, 2010
142010
Six Sigma project selections by using a fuzzy multi criteria decision making approach: A case study in poly acryl corp
SM Kazemi, M Karmasian, SM Homayouni, MR Vasili
CIE42 Proceedings, CIE and SAIIE, 306-1, 2012
132012
Quality engineering techniques: an innovative and creative process model
R Rostamkhani, M Karbasian
CRC press, 2020
112020
Developing an economical model for reliability allocation of an electro-optical system by considering reliability improvement difficulty, criticality, and subsystems dependency
M Mohamadi, M Karbasian
Journal of Industrial Engineering International 15 (2), 379-393, 2019
112019
Nie można teraz wykonać tej operacji. Spróbuj ponownie później.
Prace 1–20