Obserwuj
Chung-Li TSENG
Chung-Li TSENG
Professor, UNSW Business School, University of New South Wales
Zweryfikowany adres z unsw.edu.au
Tytuł
Cytowane przez
Cytowane przez
Rok
Harmony search for generalized orienteering problem: best touring in China
ZW Geem, CL Tseng, Y Park
International conference on natural computation, 741-750, 2005
3352005
Short-term generation asset valuation: a real options approach
CL Tseng, G Barz
Operations Research 50 (2), 297-310, 2002
2952002
Valuing flexibility in infrastructure expansion
T Zhao, CL Tseng
Journal of infrastructure systems 9 (3), 89-97, 2003
2072003
Highway development decision-making under uncertainty: A real options approach
T Zhao, SK Sundararajan, CL Tseng
Journal of infrastructure systems 10 (1), 23-32, 2004
2042004
Short-term resource scheduling with ramp constraints [power generation scheduling]
AJ Svoboda, CL Tseng, C Li, RB Johnson
IEEE Transactions on Power Systems 12 (1), 77-83, 1997
1921997
Hydro unit commitment in hydro-thermal optimization
C Li, AJ Svoboda, CL Tseng, RB Johnson, E Hsu
IEEE Transactions on Power Systems 12 (2), 764-769, 1997
1801997
On power system generation unit commitment problems
CL Tseng
University of California, Berkeley, 1996
981996
A fuzzy Petri net based approach for fault diagnosis in power systems considering temporal constraints
Y Zhang, Y Zhang, F Wen, CY Chung, CL Tseng, X Zhang, F Zeng, ...
International Journal of Electrical Power & Energy Systems 78, 215-224, 2016
932016
Inducing clean technology in the electricity sector: tradable permits or carbon tax policies?
Y Chen, CL Tseng
The Energy Journal, 149-174, 2011
762011
A framework using two-factor price lattices for generation asset valuation
CL Tseng, KY Lin
Operations Research 55 (2), 234-251, 2007
742007
A transmission-constrained unit commitment method in power system scheduling
CL Tseng, SS Oren, CS Cheng, C Li, AJ Svoboda, RB Johnson
Decision Support Systems 24 (3-4), 297-310, 1999
721999
Solving the unit commitment problem by a unit decommitment method
CL Tseng, CA Li, SS Oren
Journal of Optimization Theory and Applications 105, 707-730, 2000
662000
Trenchless water pipe condition assessment using artificial neural network
ZW Geem, CL Tseng, J Kim, C Bae
Pipelines 2007: Advances and experiences with trenchless pipeline projects, 1-9, 2007
652007
Price-based adaptive spinning reserve requirements in power system scheduling
CL Tseng, SS Oren, AJ Svoboda, RB Johnson
International Journal of Electrical Power & Energy Systems 21 (2), 137-145, 1999
611999
A robust unit commitment algorithm for hydro-thermal optimization
C Li, RB Johnson, AJ Svoboda, CL Tseng, E Hsu
Proceedings of the 20th International Conference on Power Industry Computer …, 1997
581997
Contingency estimation using a real options approach
CL Tseng, T Zhao, CC Fu
Construction Management and Economics 27 (11), 1073-1087, 2009
502009
Short-term generation asset valuation
CL Tseng, G Barz
Proceedings of the 32nd Annual Hawaii International Conference on Systems …, 1999
461999
Multi-area unit commitment for large-scale power systems
CL Tseng, X Guan, AJ Svoboda
IEE Proceedings-Generation, Transmission and Distribution 145 (4), 415-421, 1998
431998
Is now a good time for Iowa to invest in cellulosic biofuels? A real options approach considering construction lead times
Y Li, CL Tseng, G Hu
International Journal of Production Economics 167, 97-107, 2015
402015
Distinguishing “mHealth” from other healthcare services in a developing country: a study from the service quality perspective
S Motamarri, S Akter, P Ray, CL Tseng
Communications of the Association for Information Systems 34 (1), 34, 2014
402014
Nie można teraz wykonać tej operacji. Spróbuj ponownie później.
Prace 1–20