Obserwuj
Dr. Vivek Deshpande
Dr. Vivek Deshpande
Zweryfikowany adres z gcet.ac.in - Strona główna
Tytuł
Cytowane przez
Cytowane przez
Rok
Application of plan-do-check-act cycle for quality and productivity improvement-A review
PM Patel, VA Deshpande
International Journal for Research in Applied Science & Engineering …, 2017
1462017
Value stream mapping: a case study of automotive industry
PP Sheth, VA Deshpande, HR Kardani
International Journal of Research in Engineering and Technology 3 (1), 310-314, 2014
632014
Experimental investigation of the effects of process parameters on material removal rate using Taguchi method in external cylindrical grinding operation
NC Deresse, V Deshpande, IWR Taifa
Engineering Science and Technology, an International Journal 23 (2), 405-420, 2020
522020
Plant layout optimization using CRAFT and ALDEP methodology
V Deshpande, ND Patil, V Baviskar, J Gandhi
Productivity Journal by National Productivity Council 57 (1), 32-42, 2016
492016
KINEMATIC MODELLING AND ANALYSIS OF 5 DOF ROBOTIC ARM
DPMG Vivek Deshpande
International Journal of Robotics Research and Development (IJRRD) 4 (2), 17-24, 2014
48*2014
Cycle time reduction using lean principles and techniques: a review
MR Prajapati, V Deshpande
Journal, International Engineering, Industrial 3, 2015
282015
Optimization of machining parameters for turning different alloy steels using CNC
MT Patel, VA Deshpande
Int J Innov Res Sci Eng Technol 3 (2), 2014
282014
Implementation of statistical process control techniques in industry: a review
PS Parmar, VA Deshpande
Journal of Emerging Technologies and Innovative Research 1 (6), 583-587, 2014
242014
A Review of Various Tools and Techniques for Lead Time Reduction
AH Alad, VA Deshpande
24*2014
End-effector position analysis of scorbot-er vplus robot
VA Deshpande, A Verma
International Journal of Advanced Science and Technology 29, 61-66, 2011
23*2011
A Review on Improvement in Overall Equipment Effectiveness
C Patel, V Deshpande
International Journal for Research in Applied Science & Engineering …, 2016
192016
Analytical Solution for Inverse Kinematics of SCORBOT-ER-Vplus Robot
VA Deshpande, PM George
International journal of Emerging Technology and advanced engineering 2 (3 …, 2012
172012
A review on lean tools & techniques: continuous improvement in industry
MK Shah, VA Deshpande, RM Patil
International Journal of Advance Industrial Engineering 3 (4), 200-207, 2015
162015
Implementation of total productive maintenance methodology: a review
VD Kedaria, VA Deshpande
International Journal of Emerging Technology and Advanced Engineering 3 (4 …, 2014
162014
Cycle time reduction of PCF gearbox using total productive maintenance (TPM) approach
PN Chandegra, VA Deshpande
International Journal of Advance Industrial Engineering 3 (2), 60-67, 2015
122015
Application of taguchi approach for optimization roughness for boring operation of E 250 B0 for standard IS: 2062 on CNC TC
MT Patel, VA Deshpande
International Journal of Engineering Development and Research 2 (2), 2528 …, 2014
122014
M.O.S.T. – The Most Advanced Work Measurement Technique
V Deshpande
Journal of Engineering & Technology, S. P. University 20, 109-113, 2007
122007
Review Analysis on Optimization of Cylindrical Grinding Process Parameters by Using Taguchi Technique
VD Nesredin Chekole
Industrial Engineering Journal 11 (5), 35-39, 2018
102018
Experimental Investigation of Effect of Process Parameters on Mrr and Surface Roughness In Turning Operation on Conventional Lathe Machine For Aluminum 6082 Grade Material …
MT Patel, VA Deshpande
Journal of Engineering Research and Applications 4 (1), 177-185, 2014
102014
PDCA-Analysis for Quality and Productivity Improvement in BISE Plant of Apollo Tyres Limited Company
V Deshpande
Productivity Journal 54 (3), 311-324, 2013
92013
Nie można teraz wykonać tej operacji. Spróbuj ponownie później.
Prace 1–20