Obserwuj
Engin Topan
Tytuł
Cytowane przez
Cytowane przez
Rok
A review of operational spare parts service logistics in service control towers
E Topan, AS Eruguz, W Ma, MC van der Heijden, R Dekker
European journal of operational research 282 (2), 401-414, 2020
632020
An exact solution procedure for multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse
E Topan, ZP Bayındır, T Tan
Operations Research Letters 38 (5), 454-461, 2010
572010
Using supervised machine learning for B2B sales forecasting: A case study of spare parts sales forecasting at an after-sales service provider
D Rohaan, E Topan, CGM Groothuis-Oudshoorn
Expert systems with applications 188, 115925, 2022
462022
Using imperfect advance demand information in lost-sales inventory systems with the option of returning inventory
E Topan, T Tan, GJ van Houtum, R Dekker
IISE Transactions 50 (3), 246-264, 2018
462018
Operational level planning of a multi-item two-echelon spare parts inventory system with reactive and proactive interventions
E Topan, MC van der Heijden
European journal of operational research 284 (1), 164-175, 2020
362020
Heuristics for multi-item two-echelon spare parts inventory control subject to aggregate and individual service measures
E Topan, ZP Bayındır, T Tan
European Journal of Operational Research 256 (1), 126-138, 2017
362017
Application of data-driven models to predictive maintenance: Bearing wear prediction at TATA steel
X Chen, J Van Hillegersberg, E Topan, S Smith, M Roberts
Expert systems with applications 186, 115699, 2021
342021
Weighted earliness/tardiness parallel machine scheduling problem with a common due date
OA Arık, M Schutten, E Topan
Expert systems with applications 187, 115916, 2022
272022
Multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse under compound Poisson demand
E Topan, ZP Bayindir
Journal of the Operational Research Society 63 (8), 1143-1152, 2012
222012
Operational planning in service control towers–heuristics and case study
B Gerrits, E Topan, MC Van Der Heijden
European Journal of Operational Research 302 (3), 983-998, 2022
202022
Additive manufacturing in the spare parts supply chain
B Wullms, JJ Arts, EE Topan, H van der Schoot, J Schindler-Chaloub
Eindhoven University of Technology, 2014
112014
An approximation for kanban controlled assembly systems
E Topan, ZM Avṣar
Annals of Operations Research 182, 133-162, 2011
102011
Machine tools with hidden defects: Optimal usage for maximum lifetime value
A Akcay, E Topan, GJ van Houtum
IISE Transactions 53 (1), 74-87, 2021
72021
Using imperfect advance demand information in lost-sales inventory systems
E Topan, T Tan, G van Houtum, R Dekker
Technische Universiteit Eindhoven, 2016
72016
Heuristics for multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse
E Topan, ZP Bayindir, T Tan
Technische Universiteit Eindhoven, 2010
62010
Development of a repair cost calculation model for DAF trucks NV using the CRISP-DM framework
V Tumelaire, E Topan, A Wilbik
Ph. D. dissertation, Master’s thesis, Eindhoven University of Technology, 2015
32015
An approximate model for kanban controlled assembly systems
E Topan
PQDT-Global, 2005
12005
Strategic and Operational Construction Logistics Control Tower
R Harmelink, S van Merrienboer, A Adriaanse, J van Hillegersberg, ...
Developments in the Built Environment, 100625, 2025
2025
Data: to share or not to share? A Semi-Systematic Literature Review in (rational) data sharing in inter-organizational systems
R Harmelink, R Joosten, E Topan, A Adriaanse, J van Hillegersberg
Discover Data 2 (1), 1-34, 2024
2024
Real-time alert generation and operational interventions in a closed loop supply chain for repairable parts
K Alizadeh, E Topan, M van der Heijden, J van Hillegersberg
2023
Nie można teraz wykonać tej operacji. Spróbuj ponownie później.
Prace 1–20