Aggregate production planning—a survey of models and methodologies S Nam, R Logendran European Journal of Operational Research 61 (3), 255-272, 1992 | 327 | 1992 |
Scheduling unrelated parallel machines with sequence-dependent setups R Logendran, B McDonell, B Smucker Computers & Operations Research 34 (11), 3420-3438, 2007 | 193 | 2007 |
Tabu search-based heuristics for cellular manufacturing systems in the presence of alternative process plans R Logendran, P Ramakrjshna, C Sriskandarajah The International Journal of Production Research 32 (2), 273-297, 1994 | 156 | 1994 |
Sequence-dependent group scheduling problems in flexible flow shops R Logendran, P Deszoeke, F Barnard International Journal of Production Economics 102 (1), 66-86, 2006 | 136 | 2006 |
Total flow time minimization in a flowshop sequence-dependent group scheduling problem N Salmasi, R Logendran, MR Skandari Computers & Operations Research 37 (1), 199-212, 2010 | 130 | 2010 |
Impact of sequence of operations and layout of cells in cellular manufacturing R Logendran The International Journal of Production Research 29 (2), 375-390, 1991 | 129 | 1991 |
A workload based model for minimizing total intercell and intracell moves in cellular manufacturing R Logendran THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 28 (5), 913-925, 1990 | 124 | 1990 |
Group scheduling in flexible flow shops R Logendran, S Carson, E Hanson International Journal of Production Economics 96 (2), 143-155, 2005 | 122 | 2005 |
An enhanced tabu search algorithm to minimize a bi-criteria objective in batching and scheduling problems on unrelated-parallel machines with desired lower bounds on batch sizes O Shahvari, R Logendran Computers & Operations Research 77, 154-176, 2017 | 112 | 2017 |
Unrelated parallel machine scheduling with job splitting R Logendran, F Subur IIE Transactions 36 (4), 359-372, 2004 | 97 | 2004 |
Minimizing the makespan of a group scheduling problem: a new heuristic R Logendran, N Nudtasomboon International Journal of Production Economics 22 (3), 217-230, 1991 | 94 | 1991 |
Sequencing of robot activities and parts in two-machine robotic cells R Logendran, C Sriskandarajah International Journal of production research 34 (12), 3447-3463, 1996 | 85 | 1996 |
Hybrid flow shop batching and scheduling with a bi-criteria objective O Shahvari, R Logendran International Journal of Production Economics 179, 239-258, 2016 | 83 | 2016 |
Uncapacitated plant location-allocation problems with price sensitive stochastic demands R Logendran, MP Terrell Computers & operations research 15 (2), 189-198, 1988 | 83 | 1988 |
Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups R Logendran, N Salmasi, C Sriskandarajah Computers & Operations Research 33 (1), 158-180, 2006 | 80 | 2006 |
An efficient tabu search algorithm for flexible flow shop sequence-dependent group scheduling problems O Shahvari, N Salmasi, R Logendran, B Abbasi International Journal of Production Research 50 (15), 4237-4254, 2012 | 77 | 2012 |
Periodic product distribution from multi-depots under limited supplies P Parthanadee, R Logendran Iie Transactions 38 (11), 1009-1026, 2006 | 76 | 2006 |
Two-machine group scheduling problem with blocking and anticipatory setups R Logendran, C Sriskandarajah European Journal of Operational Research 69 (3), 467-481, 1993 | 71 | 1993 |
A comparison of two stage-based hybrid algorithms for a batch scheduling problem in hybrid flow shop with learning effect O Shahvari, R Logendran International Journal of Production Economics 195, 227-248, 2018 | 67 | 2018 |
Combined heuristics for bi-level group scheduling problems R Logendran, L Mai, D Talkington International Journal of Production Economics 38 (2-3), 133-145, 1995 | 62 | 1995 |