Obserwuj
Narendran TT
Narendran TT
Professor
Brak zweryfikowanego adresu e-mail - Strona główna
Tytuł
Cytowane przez
Cytowane przez
Rok
A genetic algorithm approach to the machine-component grouping problem with multiple objectives
V Venugopal, TT Narendran
Computers & Industrial Engineering 22 (4), 469-480, 1992
4051992
An assignment model for the part-families problem in group technology
G Srinlvasan, TT Narendran, B Mahadevan
The International Journal of Production Research 28 (1), 145-152, 1990
3811990
GRAFICS—a nonhierarchical clustering algorithm for group technology
G Srinivasan, TT Narendran
The International Journal of Production Research 29 (3), 463-478, 1991
2861991
CASE: A clustering algorithm for cell formation with sequence data
GJ Nair, TT Narendran
International journal of production research 36 (1), 157-180, 1998
2121998
Design of an automated guided vehicle-based material handling system for a flexible manufacturing system
B Mahadevan, TT Narendran
The International Journal of Production Research 28 (9), 1611-1622, 1990
1901990
Selection of optimal conditions in multi-pass face-milling using a genetic algorithm
MS Shunmugam, SVB Reddy, TT Narendran
International Journal of Machine Tools and Manufacture 40 (3), 401-414, 2000
1832000
Cell formation in manufacturing systems through simulated annealing: an experimental evaluation
V Venugopal, TT Narendran
European Journal of Operational Research 63 (3), 409-422, 1992
1671992
CLOVES: A cluster-and-search heuristic to solve the vehicle routing problem with delivery and pick-up
K Ganesh, TT Narendran
European Journal of Operational Research 178 (3), 699-717, 2007
1542007
Operation sequencing in CAPP using genetic algorithms
SVB Reddy
International Journal of Production Research 37 (5), 1063-1074, 1999
1451999
Machine-cell formation through neural network models
V Venugopal, TT Narendran
The International Journal of Production Research 32 (9), 2105-2116, 1994
1021994
PRISM: PRIority based SiMulated annealing for a closed loop supply chain network design problem
P Subramanian, N Ramkumar, TT Narendran, K Ganesh
Applied soft computing 13 (2), 1121-1135, 2013
932013
Estimation of number of AGVs for an FMS: an analytical model
B Mahadevan, TT Narendran
The International Journal of Production Research 31 (7), 1655-1670, 1993
891993
Neural network model for design retrieval in manufacturing systems
V Venugopal, TT Narendran
Computers in industry 20 (1), 11-23, 1992
751992
Accord: A bicriterion algorithmfor cell formation using ordinal and ratio-level data
GJ Nair
International Journal of Production Research 37 (3), 539-556, 1999
691999
A framework for assessing the flexibility of manufacturing systems
VP Kochikar, TT Narendran
The International Journal Of Production Research 30 (12), 2873-2895, 1992
691992
Heuristics and sequence-dependent set-up jobs in flow line cells
V Reddy, TT Narendran
International Journal of Production Research 41 (1), 193-206, 2003
652003
Grouping PCBs for set-up reduction: a maximum spanning tree approach
G Bhaskar, TT Narendran
International Journal of Production Research 34 (3), 621-632, 1996
621996
A hybrid modelling approach to the design of an AGV-based material handling system for an FMS
B Mahadevan, TT Narendran
The international journal of production research 32 (9), 2015-2030, 1994
601994
Optimal sub-division of the depth of cut to achieve minimum production cost in multi-pass turning using a genetic algorithm
SVB Reddy, MS Shunmugam, TT Narendran
Journal of Materials Processing Technology 79 (1-3), 101-108, 1998
571998
Mixed integer linear programming model for multi-commodity multi-depot inventory routing problem
N Ramkumar, P Subramanian, TT Narendran, K Ganesh
Opsearch 49, 413-429, 2012
562012
Nie można teraz wykonać tej operacji. Spróbuj ponownie później.
Prace 1–20