Total flow time minimization in a flowshop sequence-dependent group scheduling problem N Salmasi, R Logendran, MR Skandari Computers & Operations Research 37 (1), 199-212, 2010 | 130 | 2010 |
Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups R Logendran, N Salmasi, C Sriskandarajah Computers & Operations Research 33 (1), 158-180, 2006 | 80 | 2006 |
An efficient tabu search algorithm for flexible flow shop sequence-dependent group scheduling problems O Shahvari, N Salmasi, R Logendran, B Abbasi International Journal of Production Research 50 (15), 4237-4254, 2012 | 77 | 2012 |
Maximizing the nurses’ preferences in nurse scheduling problem: mathematical modeling and a meta-heuristic algorithm H Jafari, N Salmasi Journal of industrial engineering international 11, 439-458, 2015 | 74 | 2015 |
A fast hybrid particle swarm optimization algorithm for flow shop sequence dependent group scheduling problem D Hajinejad, N Salmasi, R Mokhtari Scientia Iranica 18 (3), 759-764, 2011 | 67 | 2011 |
Permutation flowshops in group scheduling with sequence-dependent setup times B Naderi, N Salmasi European Journal of Industrial Engineering 6 (2), 177-198, 2012 | 65 | 2012 |
Makespan minimization of a flowshop sequence-dependent group scheduling problem N Salmasi, R Logendran, MR Skandari The International Journal of Advanced Manufacturing Technology 56, 699-710, 2011 | 57 | 2011 |
Minimization of weighted earliness and tardiness for no-wait sequence-dependent setup times flowshop scheduling problem S Arabameri, N Salmasi Computers & Industrial Engineering 64 (4), 902-916, 2013 | 47 | 2013 |
Flowshop sequence-dependent group scheduling with minimisation of weighted earliness and tardiness T Keshavarz, N Salmasi, M Varmazyar European Journal of Industrial Engineering 13 (1), 54-80, 2019 | 42 | 2019 |
A branch-and-bound algorithm for the single machine sequence-dependent group scheduling problem with earliness and tardiness penalties T Keshavarz, M Savelsbergh, N Salmasi Applied Mathematical Modelling 39 (20), 6410-6424, 2015 | 42 | 2015 |
Minimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem T Keshavarz, N Salmasi, M Varmazyar Annals of Operations Research 226, 351-377, 2015 | 39 | 2015 |
Stochastic scheduling with minimizing the number of tardy jobs using chance constrained programming A Elyasi, N Salmasi Mathematical and Computer Modelling 57, 1154-1164, 2013 | 39 | 2013 |
Makespan minimisation in flexible flowshop sequence-dependent group scheduling problem T Keshavarz, N Salmasi International Journal of Production Research 51 (20), 6182-6193, 2013 | 36 | 2013 |
Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times SA Mansouri, SH Hendizadeh, N Salmasi The International Journal of Advanced Manufacturing Technology 40 (11), 1216 …, 2009 | 34 | 2009 |
Total completion time minimisation of no-wait flowshop group scheduling problem with sequence dependent setup times S Behjat, N Salmasi European Journal of Industrial Engineering 11 (1), 22-48, 2017 | 31 | 2017 |
Sequence-dependent flow shop scheduling problem minimising the number of tardy jobs M Varmazyar, N Salmasi International Journal of Production Research 50 (20), 5843-5858, 2012 | 31 | 2012 |
A two-criteria objective function flexible flowshop scheduling problem with machine eligibility constraint B Tadayon, N Salmasi The International Journal of Advanced Manufacturing Technology 64 (5-8 …, 2013 | 30 | 2013 |
Makespan minimization in flowshop batch processing problem with different batch compositions on machines HNZ Matin, N Salmasi, O Shahvari International Journal of Production Economics 193, 832-844, 2017 | 27 | 2017 |
Operating room scheduling problem under uncertainty: Application of continuous phase-type distributions M Varmazyar, R Akhavan-Tabatabaei, N Salmasi, M Modarres IISE Transactions 52 (2), 216-235, 2020 | 24 | 2020 |
Stochastic flow-shop scheduling with minimizing the expected number of tardy jobs A Elyasi, N Salmasi The international journal of advanced manufacturing technology 66 (1), 337-346, 2013 | 24 | 2013 |