Obserwuj
Lorenzo Ros McDonnell
Tytuł
Cytowane przez
Cytowane przez
Rok
Integrating forward and reverse supply chains: application to a metal-mechanic company
MV de la Fuente, L Ros, M Cardos
International Journal of Production Economics 111 (2), 782-792, 2008
1532008
Enterprise integration—business processes integrated management: a proposal for a methodology to develop enterprise integration programs
A Ortiz, F Lario, L Ros
Computers in Industry 40 (2-3), 155-171, 1999
1341999
Comparación entre los modelos de gestión de calidad total: EFQM, gerencial de Deming, Iberoamericano para la excelencia y Malcom Baldrige. Situación frente a la ISO 9000
C de Nieves Nieto, LR McDonnell
X Congreso de Ingeniería de Organización, 2006
1302006
Enterprise modelling methodology for forward and reverse supply chain flows integration
MV de la Fuente, L Ros, A Ortiz
Computers in Industry 61 (7), 702-710, 2010
642010
Analysis of freight distribution flows in an urban functional area
L Ros-McDonnell, MV de-la-Fuente-Aragón, D Ros-McDonnell, M Cardós
Cities 79, 159-168, 2018
432018
Location and lead-time perturbations in multi-level assembly systems of perishable goods in Spanish baby food logistics
D Kovačić, E Hontoria, L Ros-McDonnell, M Bogataj
Central European journal of operations research 23, 607-623, 2015
432015
Building a production planning process with an approach based on CIMOSA and workflow management systems
A Ortiz, F Lario, L Ros, M Hawa
Computers in Industry 40 (2-3), 207-219, 1999
401999
An exact calculation of the cycle service level in a generalized periodic review system
M Cardós, C Miralles, L Ros
Journal of the Operational Research Society 57 (10), 1252-1255, 2006
322006
Cadenas de suministro tradicionales y colaborativas.
F Campuzano-Bolarín, E Martínez-Caro, L Ros-McDonell
DYNA-Ingeniería e Industria 85 (1), 2010
292010
Improving the role played by humans in the development of enterprise engineering and integration projects through training based on multimedia
M Hawa, A Ortiz, F Lario, L Ros
International Journal of Computer Integrated Manufacturing 15 (4), 335-344, 2002
242002
A compact representation of distribution and reverse logistics in the value chain
RW Grubbström, M Bogataj, L Bogataj
Faculty of Economics, KMOR, 2007
212007
Consecuencias del efecto Bullwhip según distintas estrategias de gestión de la cadena de suministro: modelado y simulación
FC Bolarín, FCL Esteban, LR McDonnell
Revista de Métodos Cuantitativos para la Economía y la Empresa 5, 49-66, 2008
172008
Reducing the impact of demand process variability within a multi-echelon supply chain
FC Bolarín, LR Mcdonnell, JM García
The Icfai Journal of Supply Chain Management 5 (2), 7-21, 2008
172008
Implementing a lean production system on a food company: a case study
MVDLF Aragón, L Ros-McDonnell
International Journal of Engineering Management and Economics 5 (1-2), 129-142, 2015
162015
Cold supply chain processes in a fruit-and-vegetable collaborative network
MV De-La-Fuente, L Ros
International Conference on Information Technology for Balanced Automation …, 2010
142010
Bullwhip effect consequences according to different supply chain management strategies: modelling and simulation
F Campuzano Bolarín, L Mcdonnel Ros, FC Lario Esteban
Journal of Quantitative Methods for Economics and Business Administration 5 …, 2008
142008
Sustainable urban homecare delivery with different means of transport
N Szander, L Ros-McDonnell, MV De-la-Fuente-Aragón, R Vodopivec
Sustainability 10 (2), 398, 2018
132018
The Influence of Lead Time Variability on Supply Chain Costs: Analysis of Its Impact on the Bullwhip Effect.
FC Bolarín, AG Frutos, LR Mcdonnell
IUP Journal of Supply Chain Management 6, 2009
122009
Algorithm for efficient and sustainable home health care delivery scheduling
N Szander, L Ros-McDonnell, MV de la Fuente
New Global Perspectives on Industrial Engineering and Management …, 2019
112019
Development of an Algorithm for the Application of Group Technology in the Design of Manufacturing Systems
RP Escoto, LR McDonnell, FCL Esteban, EV Salort
Production Planning & Control 9 (3), 267-274, 1998
111998
Nie można teraz wykonać tej operacji. Spróbuj ponownie później.
Prace 1–20