Følg
Dinesh Seth
Dinesh Seth
Professor and Dean, Dr.Vishwanath Karad MIT World Peace University
Verifisert e-postadresse på mitwpu.edu.in
Tittel
Sitert av
Sitert av
År
Application of value stream mapping for lean operations and cycle time reduction: an Indian case study
D Seth*, V Gupta
Production Planning & Control 16 (1), 44-59, 2005
6092005
Relationship between TQM and TPM implementation factors and business performance of manufacturing industry in Indian context
D Seth, D Tripathi
International Journal of Quality & Reliability Management 22 (3), 256-277, 2005
2832005
Impact of green manufacturing practices on organisational performance in Indian context: an empirical study
MA Rehman, D Seth, RL Shrivastava
Journal of cleaner production 137, 427-448, 2016
2522016
Application of value stream mapping (VSM) for lean and cycle time reduction in complex production environments: a case study
D Seth, N Seth, P Dhariwal
Production Planning & Control 28 (5), 398-419, 2017
2482017
Critical success factors for Lean Six Sigma in SMEs (small and medium enterprises)
M Lande, RL Shrivastava, D Seth
The TQM Journal 28 (4), 613-635, 2016
2452016
Application of value stream mapping (VSM) for minimization of wastes in the processing side of supply chain of cottonseed oil industry in Indian context
D Seth, N Seth, D Goel
Journal of Manufacturing Technology Management 19 (4), 529-550, 2008
2342008
Green manufacturing drivers and their relationships for small and medium (SME) and large industries
D Seth, MAA Rehman, RL Shrivastava
Journal of Cleaner Production 198, 1381-1405, 2018
2132018
A critical study of TQM and TPM approaches on business performance of Indian manufacturing industry
D Seth, D Tripathi
Total Quality Management & Business Excellence 17 (7), 811-824, 2006
1452006
Application of hybrid framework to facilitate lean six sigma implementation: a manufacturing company case experience
G Yadav, D Seth, TN Desai
Production Planning & Control 29 (3), 185-201, 2018
1232018
Prioritising solutions for Lean Six Sigma adoption barriers through fuzzy AHP-modified TOPSIS framework
G Yadav, D Seth, TN Desai
International Journal of Lean Six Sigma 9 (3), 270-300, 2018
1082018
An integrated resource allocation and distribution model for pre-disaster planning
R Pradhananga, F Mutlu, S Pokharel, J Holguín-Veras, D Seth
Computers & Industrial Engineering 91, 229-238, 2016
1082016
Quality dimensions of e-commerce and their implications
RP Mohanty, D Seth, S Mukadam
Total Quality Management & Business Excellence 18 (3), 219-247, 2007
912007
Impact of competitive conditions on supplier evaluation: a construction supply chain case study
D Seth, VSRK Nemani, S Pokharel, AY Al Sayed
Production planning & control 29 (3), 217-235, 2018
822018
An empirical investigation of critical success factors and performance measures for green manufacturing in cement industry
D Seth, RL Shrivastava, S Shrivastava
Journal of Manufacturing Technology Management 27 (8), 1076-1101, 2016
822016
Analysis of research trends and constructs in context to lean six sigma frameworks
G Yadav, D Seth, TN Desai
Journal of Manufacturing Technology Management 28 (6), 794-821, 2017
652017
Application and evaluation of packaging postponement strategy to boost supply chain responsiveness: a case study
D Seth, A Panigrahi
Production planning & control 26 (13), 1069-1089, 2015
622015
Influence of PVC waste powder and silica fume on strength and microstructure properties of concrete: An experimental study
M Manjunatha, D Seth, K Balaji, S Chilukoti
Case Studies in Construction Materials 15, e00610, 2021
522021
Engineering properties and environmental impact assessment of green concrete prepared with PVC waste powder: A step towards sustainable approach
M Manjunatha, D Seth, K Balaji, A Bharath
Case Studies in Construction Materials 17, e01404, 2022
462022
A multiple-item inventory model for a non-stationary demand
D Seth, MK Pandey
Production Planning and Control 20 (3), 242-253, 2009
442009
Application of vendor rationalization strategy for manufacturing cycle time reduction in engineer to order (ETO) environment: a case study
D Seth, S Rastogi
Journal of Manufacturing Technology Management 30 (1), 261-290, 2019
302019
Systemet kan ikke utføre handlingen. Prøv på nytt senere.
Artikler 1–20