Følg
Shokrollah Zare
Shokrollah Zare
Verifisert e-postadresse på shahroodut.ac.ir
Tittel
Sitert av
Sitert av
År
Comparison of tunnel blast design models
S Zare, A Bruland
Tunnelling and underground space technology 21 (5), 533-541, 2006
762006
Applications of NTNU/SINTEF drillability indices in hard rock tunneling
S Zare, A Bruland
Rock mechanics and rock engineering 46, 179-187, 2013
712013
Face stability evaluation of a TBM-driven tunnel in heterogeneous soil using a probabilistic approach
A Eshraghi, S Zare
International Journal of Geomechanics 15 (6), 04014095, 2015
632015
Probabilistic prediction of expected ground condition and construction time and costs in road tunnels
A Mahmoodzadeh, S Zare
Journal of Rock Mechanics and Geotechnical Engineering 8 (5), 734-745, 2016
542016
Slope stability in swelling soils using cement grout: a case study
A Daraei, BMA Herki, AFH Sherwani, S Zare
International Journal of Geosynthetics and Ground Engineering 4, 1-10, 2018
432018
Tracking of disc cutter wear in TBM tunneling: a case study of Kerman water conveyance tunnel
M Karami, S Zare, J Rostami
Bulletin of Engineering Geology and the Environment 80, 201-219, 2021
392021
Evaluating D&B and TBM tunnelling using NTNU prediction models
S Zare, A Bruland, J Rostami
Tunnelling and Underground Space Technology 59, 55-64, 2016
372016
Stabilization of problematic soil by utilizing cementitious materials
A Daraei, AFH Sherwani, RH Faraj, S Mohammad, S Kurdo, S Zare, ...
Innovative Infrastructure Solutions 4, 1-11, 2019
312019
Developing the rule of thumb for evaluating penetration rate of TBM, using binary classification
M Akbarzadeh, S Shaffiee Haghshenas, SME Jalali, S Zare, R Mikaeil
Geotechnical and Geological Engineering 40 (9), 4685-4703, 2022
302022
Effect of water content variations on critical and failure strains of rock
A Daraei, S Zare
KSCE Journal of Civil Engineering 22 (9), 3331-3339, 2018
292018
Evaluation of structural analysis of tunnel segmental lining using beam-spring method and force-method (Case study: Chamshir water conveyance tunnel)
M Nikkhah, SS Mousavi, S Zare, O Khademhosseini
Journal of Mining and Environment 8 (1), 111-130, 2017
272017
Introducing an empirical model for prediction of disc cutter life for TBM application in jointed rocks: case study, Kerman water conveyance tunnel
M Karami, S Zare, J Rostami
Bulletin of Engineering Geology and the Environment 80 (5), 3853-3870, 2021
252021
Prediction of overbreak depth in Ghalaje road tunnel using strength factor
A Daraei, S Zare
International Journal of Mining Science and Technology 28 (4), 679-684, 2018
232018
A new multi-graph approach for selecting the sequential excavation method of civil tunnels
A Daraei, S Zare
Tunnelling and Underground Space Technology 91, 102999, 2019
212019
Progress of drill and blast tunnelling efficiency with relation to excavation time and costs
S Zare, A Bruland
Proceedings of the 33rd ITAAITES World Tunnel Congress, Prague, Czech …, 2007
212007
Prediction model and simulation tool for time and costs of drill and blast tunnelling
S Zare
NTNU, 2007
182007
Study of common wear prediction models for hard rock TBM disc cutters and comparison with field observation in Kerman water conveyance tunnel
M Karami, S Zare, J Rostami
Bulletin of Engineering Geology and the Environment 80, 1467-1476, 2021
152021
Numerical modelling of backfill grouting approaches in EPB tunneling
L Nikakhtar, S Zare, H Mirzaei Nasir Abad
Journal of mining and environment 11 (1), 301-314, 2020
152020
Application of ANN-PSO algorithm based on FDM numerical modelling for back analysis of EPB TBM tunneling parameters
L Nikakhtar, S Zare, HM Nasirabad, B Ferdosi
European Journal of Environmental and Civil Engineering 26 (8), 3169-3186, 2022
142022
A new strain-based criterion for evaluating tunnel stability
A Daraei, S Zare
Geomechanics & engineering 16 (2), 205-215, 2018
142018
Systemet kan ikke utføre handlingen. Prøv på nytt senere.
Artikler 1–20