Improving the performance of stormwater detention basins by real-time control using rainfall forecasts E Gaborit, D Muschalla, B Vallet, PA Vanrolleghem, F Anctil Urban water journal 10 (4), 230-246, 2013 | 118 | 2013 |
The great lakes runoff intercomparison project phase 4: the great lakes (GRIP-GL) J Mai, H Shen, BA Tolson, É Gaborit, R Arsenault, JR Craig, V Fortin, ... Hydrology and Earth System Sciences 26 (13), 3537-3572, 2022 | 61 | 2022 |
A 10 km North American precipitation and land-surface reanalysis based on the GEM atmospheric model N Gasset, V Fortin, M Dimitrijevic, M Carrera, B Bilodeau, R Muncaster, ... Hydrology and Earth System Sciences 25 (9), 4917-4945, 2021 | 50 | 2021 |
Exploring forecast-based management strategies for stormwater detention ponds E Gaborit, F Anctil, G Pelletier, PA Vanrolleghem Urban Water Journal 13 (8), 841-851, 2016 | 40 | 2016 |
Assessing the factors governing the ability to predict late-spring flooding in cold-region mountain basins V Vionnet, V Fortin, E Gaborit, G Roy, M Abrahamowicz, N Gasset, ... Hydrology and Earth System Sciences 24 (4), 2141-2165, 2020 | 37 | 2020 |
A hydrological prediction system based on the SVS land-surface scheme: Efficient calibration of GEM-Hydro for streamflow simulation over the Lake Ontario basin É Gaborit, V Fortin, X Xu, F Seglenieks, B Tolson, LM Fry, T Hunter, ... Hydrology and Earth System Sciences 21 (9), 4825-4839, 2017 | 31 | 2017 |
Comparing global and local calibration schemes from a differential split-sample test perspective É Gaborit, S Ricard, S Lachance-Cloutier, F Anctil, R Turcotte Canadian Journal of Earth Sciences 52 (11), 990-999, 2015 | 30 | 2015 |
On the reliability of spatially disaggregated global ensemble rainfall forecasts É Gaborit, F Anctil, V Fortin, G Pelletier Hydrological Processes 27 (1), 45-56, 2013 | 25 | 2013 |
Great lakes runoff intercomparison project phase 3: lake Erie (GRIP-E) J Mai, BA Tolson, H Shen, É Gaborit, V Fortin, N Gasset, H Awoye, ... Journal of hydrologic engineering 26 (9), 05021020, 2021 | 23 | 2021 |
A field evaluation of soil moisture modelling with the Soil, Vegetation, and Snow (SVS) land surface model using evapotranspiration observations as forcing data A Maheu, F Anctil, É Gaborit, V Fortin, DF Nadeau, R Therrien Journal of Hydrology 558, 532-545, 2018 | 22 | 2018 |
Great Lakes runoff inter-comparison project, phase 2: Lake Ontario (GRIP-O) É Gaborit, V Fortin, B Tolson, L Fry, T Hunter, AD Gronewold Journal of Great Lakes Research 43 (2), 217-227, 2017 | 21 | 2017 |
Subwatershed-based lake and river routing products for hydrologic and land surface models applied over Canada M Han, J Mai, BA Tolson, JR Craig, É Gaborit, H Liu, K Lee Canadian Water Resources Journal/Revue canadienne des ressources hydriques …, 2020 | 12 | 2020 |
Evaluation of the Soil, Vegetation, and Snow (SVS) land surface model for the simulation of surface energy fluxes and soil moisture under snow-free conditions G Leonardini, F Anctil, M Abrahamowicz, É Gaborit, V Vionnet, ... Atmosphere 11 (3), 278, 2020 | 10 | 2020 |
Simulation du débit de la rivière Saint-Charles, première source d’eau potable de la ville de Québec E Gaborit, G Pelletier, PA Vanrolleghem, F Anctil Canadian Journal of Civil Engineering 37 (2), 311-321, 2010 | 9 | 2010 |
Hydrological prediction systems at environment and climate change Canada D Durnford, V Fortin, G Smith, M Carrera, D Deacu, F Dupont, E Gaborit, ... 101st American Meteorological Society Annual Meeting, 2021 | 6 | 2021 |
Hydrologic evaluation of spatially disaggregated global ensemble rainfall forecasts E Gaborit, F Anctil, V Fortin, G Pelletier Hydrological Processes 28 (17), 4682-4693, 2014 | 6 | 2014 |
Improving snow analyses for hydrological forecasting at ECCC using satellite-derived data C Garnaud, V Vionnet, É Gaborit, V Fortin, B Bilodeau, M Carrera, ... Remote Sensing 13 (24), 5022, 2021 | 5 | 2021 |
High-resolution hydrometeorological modelling of the June 2013 flood in southern Alberta, Canada V Vionnet, V Fortin, E Gaborit, G Roy, M Abrahamowicz, N Gasset, ... Hydrology and Earth System Sciences Discussions 1, 2019 | 4 | 2019 |
On the implementation of the Dynamically Zoned Target Release Reservoir Model in the GEM-Hydro streamflow forecasting system É Gaborit, V Fortin, D Durnford Canadian Journal of Civil Engineering 49 (10), 1582-1594, 2022 | 3 | 2022 |
Assessing 32-Day hydrological ensemble forecasts in the Lake Champlain–Richelieu River watershed M Abaza, V Fortin, É Gaborit, S Bélair, C Garnaud Journal of Hydrologic Engineering 25 (10), 04020045, 2020 | 3 | 2020 |