A multi-objective stochastic programming approach for supply chain design considering risk A Azaron, KN Brown, SA Tarim, M Modarres International Journal of Production Economics 116 (1), 129-138, 2008 | 462 | 2008 |
Solving a dynamic cell formation problem using metaheuristics R Tavakkoli-Moghaddam, MB Aryanezhad, N Safaei, A Azaron Applied Mathematics and Computation 170 (2), 761-780, 2005 | 177 | 2005 |
A genetic algorithm approach for the time-cost trade-off in PERT networks A Azaron, C Perkgoz, M Sakawa Applied mathematics and computation 168 (2), 1317-1339, 2005 | 169 | 2005 |
Improved estimation of electricity demand function by using of artificial neural network, principal component analysis and data envelopment analysis A Kheirkhah, A Azadeh, M Saberi, A Azaron, H Shakouri Computers & Industrial Engineering 64 (1), 425-441, 2013 | 118 | 2013 |
A hybrid method for solving stochastic job shop scheduling problems R Tavakkoli-Moghaddam, F Jolai, F Vaziri, PK Ahmed, A Azaron Applied mathematics and computation 170 (1), 185-206, 2005 | 117 | 2005 |
Dynamic shortest path in stochastic dynamic networks: Ship routing problem A Azaron, F Kianfar European Journal of Operational Research 144 (1), 138-156, 2003 | 93 | 2003 |
Robust and fuzzy goal programming optimization approaches for a novel multi-objective hub location-allocation problem: A supply chain overview A Ghodratnama, R Tavakkoli-Moghaddam, A Azaron Applied Soft Computing 37, 255-276, 2015 | 87 | 2015 |
Pharmacological therapy selection of type 2 diabetes based on the SWARA and modified MULTIMOORA methods under a fuzzy environment M Eghbali-Zarch, R Tavakkoli-Moghaddam, F Esfahanian, MM Sepehri, ... Artificial intelligence in medicine 87, 20-33, 2018 | 79 | 2018 |
The use of a GERT based method to model concurrent product development processes RG Nelson, A Azaron, S Aref European journal of operational research 250 (2), 566-578, 2016 | 79 | 2016 |
Risk assessment for highway projects using jackknife technique SM Mousavi, R Tavakkoli-Moghaddam, A Azaron, SMH Mojtahedi, ... Expert Systems with Applications 38 (5), 5514-5524, 2011 | 78 | 2011 |
Multi-objective reliability optimization for dissimilar-unit cold-standby systems using a genetic algorithm A Azaron, C Perkgoz, H Katagiri, K Kato, M Sakawa Computers & Operations Research 36 (5), 1562-1571, 2009 | 74 | 2009 |
A multi-objective resource allocation problem in PERT networks A Azaron, H Katagiri, M Sakawa, K Kato, A Memariani European journal of operational research 172 (3), 838-854, 2006 | 73 | 2006 |
Multi-objective time–cost trade-off in dynamic PERT networks using an interactive approach A Azaron, R Tavakkoli-Moghaddam European Journal of Operational Research 180 (3), 1186-1200, 2007 | 71 | 2007 |
A differential evolution algorithm to solve multi-skilled project portfolio scheduling problems H Kazemipoor, R Tavakkoli-Moghaddam, P Shahnazari-Shahrezaei, ... The International Journal of Advanced Manufacturing Technology 64, 1099-1111, 2013 | 66 | 2013 |
Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness G Moslehi, M Mirzaee, M Vasei, M Modarres, A Azaron International Journal of Production Economics 122 (2), 763-773, 2009 | 66 | 2009 |
An adaptive network based fuzzy inference system–genetic algorithm clustering ensemble algorithm for performance assessment and improvement of conventional power plants A Azadeh, M Saberi, M Anvari, A Azaron, M Mohammadi Expert Systems with Applications 38 (3), 2224-2234, 2011 | 57 | 2011 |
Reliability evaluation of multi-component cold-standby redundant systems A Azaron, H Katagiri, K Kato, M Sakawa Applied Mathematics and Computation 173 (1), 137-149, 2006 | 56 | 2006 |
Optimal scheduling for a single machine to minimize the sum of maximum earliness and tardiness considering idle insert R Tavakkoli-Moghaddam, G Moslehi, M Vasei, A Azaron Applied Mathematics and Computation 167 (2), 1430-1450, 2005 | 56 | 2005 |
A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms C Perkgoz, A Azaron, H Katagiri, K Kato, M Sakawa European Journal of Operational Research 180 (1), 292-308, 2007 | 51 | 2007 |
Modelling complex assemblies as a queueing network for lead time control A Azaron, H Katagiri, K Kato, M Sakawa European Journal of Operational Research 174 (1), 150-168, 2006 | 51 | 2006 |