Forecast, solution, and rolling horizons in operations management problems: A classified bibliography S Chand, VN Hsu, S Sethi Manufacturing & Service Operations Management 4 (1), 25-43, 2002 | 289 | 2002 |
A note on “Economic order quantity under conditions of permissible delay in payments” S Chand, J Ward Journal of the Operational Research Society 38 (1), 83-84, 1987 | 182 | 1987 |
Planning horizon procedures for machine replacement models S Sethi, S Chand Management Science 25 (2), 140-151, 1979 | 168 | 1979 |
An empirical investigation into factors affecting patient cancellations and no-shows at outpatient clinics JB Norris, C Kumar, S Chand, H Moskowitz, SA Shade, DR Willis Decision Support Systems 57, 428-443, 2014 | 151 | 2014 |
The single-item lot-sizing problem with immediate lost sales D Aksen, K Altınkemer, S Chand European Journal of Operational Research 147 (3), 558-566, 2003 | 151 | 2003 |
Single machine scheduling to minimize weighted earliness subject to no tardy jobs S Chand, H Schneeberger European Journal of Operational Research 34 (2), 221-230, 1988 | 146 | 1988 |
Planning horizon procedures for machine replacement models with several possible replacement alternatives S Chand, S Sethi Naval Research Logistics Quarterly 29 (3), 483-493, 1982 | 132 | 1982 |
Lot sizes and setup frequency with learning in setups and process quality S Chand European Journal of Operational Research 42 (2), 190-202, 1989 | 123 | 1989 |
Improving patient flow at an outpatient clinic: study of sources of variability and improvement factors S Chand, H Moskowitz, JB Norris, S Shade, DR Willis Health care management science 12, 325-340, 2009 | 114 | 2009 |
Capacity allocation for dynamic process improvement with quality and demand considerations S Chand, H Moskowitz, A Novak, I Rekhi, G Sorger Operations Research 44 (6), 964-975, 1996 | 94 | 1996 |
A model for parallel machine replacement with capacity expansion S Chand, T McClurg, J Ward European Journal of Operational Research 121 (3), 519-531, 2000 | 92 | 2000 |
A dynamic lot sizing model with learning in setups S Chand, SP Sethi Operations Research 38 (4), 644-655, 1990 | 78 | 1990 |
A note on dynamic lot sizing in a rolling‐horizon environment S Chand Decision Sciences 13 (1), 113-119, 1982 | 77 | 1982 |
Minimal forecast horizon procedures for dynamic lot size models S Chand, TE Morton Naval Research Logistics Quarterly 33 (1), 111-122, 1986 | 74 | 1986 |
Effect of learning and forgetting on batch sizes S Teyarachakul, S Chand, J Ward Production and Operations Management 20 (1), 116-128, 2011 | 68 | 2011 |
Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates S Chand, R Traub, R Uzsoy Annals of Operations Research 70 (0), 115-125, 1997 | 67 | 1997 |
A note on the single‐machine scheduling problem with minimum weighted completion time and maximum allowable tardiness S Chand, H Schneeberger Naval Research Logistics Quarterly 33 (3), 551-557, 1986 | 64 | 1986 |
Existence of forecast horizons in undiscounted discrete-time lot size models S Chand, SP Sethi, JM Proth Operations Research 38 (5), 884-892, 1990 | 63 | 1990 |
A single machine model for determination of optimal due dates and sequence S Chand, D Chhajed Operations Research 40 (3), 596-602, 1992 | 61 | 1992 |
A parts selection model with one-way substitution S Chand, JE Ward, ZK Weng European Journal of Operational Research 73 (1), 65-69, 1994 | 60 | 1994 |