Segui
Philippe Duquenne
Philippe Duquenne
Laboratoire de Génie Chimique, Toulouse INP
Email verificata su ensiacet.fr - Home page
Titolo
Citata da
Citata da
Anno
Considering skills evolutions in multi-skilled workforce allocation with flexible working hours
EA Attia, P Duquenne, JM Le-Lann
International Journal of Production Research 52 (15), 4548-4573, 2014
892014
Aggregate production planning considering organizational learning with case based analysis
EA Attia, A Megahed, A AlArjani, A Elbetar, P Duquenne
Ain Shams Engineering Journal 13 (2), 101575, 2022
252022
A MILP model for an integrated project scheduling and multi-skilled workforce allocation with flexible working hours
A Karam, EA Attia, P Duquenne
IFAC-PapersOnLine 50 (1), 13964-13969, 2017
242017
Factors affecting the development of workforce versatility
EA Attia, V Dumbrava, P Duquenne
IFAC Proceedings Volumes 45 (6), 1221-1226, 2012
212012
Flexible resources allocation techniques: characteristics and modelling
EA Attia, KH Edi, P Duquenne
International Journal of Operational Research 14 (2), 221-254, 2012
212012
Characterization and modelling of flexible resources allocation on industrial activities
P Duquenne, KH Edi, JM Le Lann
7th world congress on chemical engineering Glasgow, Ecosse, 1-9, 2005
182005
Application of inductive heating to granular media: Modelling of electrical phenomena
P Duquenne, A Deltour, G Lacoste
The Canadian Journal of Chemical Engineering 72 (6), 975-981, 1994
151994
Application of inductive heating to granular media: temperature distribution in a granular bed.
P Duquenne, A Deltour, G Lacoste
International journal of heat and mass transfer 36 (9), pp. 2473-2477, 1993
131993
Analysis of reliability aspects of wind power generation in Romania using Markov models
V Dumbrava, AP Ulmeanu, M Scutariu, C Lazaroiu, P Duquenne
IET Conference on Renewable Power Generation (RPG 2011), 184, 2011
112011
Expansion planning of distribution networks by heuristic algorithms
V Dumbrava, P Ulmeanu, P Duquenne, C Lazaroiu, M Scutariu
45th International Universities Power Engineering Conference UPEC2010, 1-6, 2010
92010
Optimisation des plans de charge pour un flow-shop dans le cadre d’une production en Juste A Temps: 2-Formulation mathématique
E Vidal, P Duquenne, H Pingaud
3ème Congrès Franco-Quebequois de Génie Industriel, 0, 1999
91999
Stochastic programming approach for TEP optimization considering RES integration in electricity market
CA Sima, GC Lazaroiu, V Dumbrava, M Roscia, D Zaninelli, P Duquenne
2017 International Conference on ENERGY and ENVIRONMENT (CIEM), 485-489, 2017
82017
Problème d'affectation flexible des ressources humaines: Un modèle dynamique
EA Attia, P Duquenne, JM Le Lann
12ème congrès annuel de la Société française de Recherche Opérationnelle et …, 2011
82011
Decision-based genetic algorithms for solving multi-period project scheduling with dynamically experienced workforce
EA Attia, P Duquenne, JM Le-Lann
Proceedings of MOSIM 12, 2012
72012
Prise en compte des évolutions de compétences pour les ressources humaines
EA Attia, P Duquenne, JM Le Lann
9ème Congrès International de Génie Industriel (CIGI2011), 0, 2011
72011
Intégration de la polyvalence et de la modulation d'horaire dans une approche d'affectation flexible de la ressource humaine
KH Edi, P Duquenne
revue ivoirienne des sciences et technologies, 1-20, 2009
72009
Towards a learning curve for electric motors production under organizational learning via shop floor data
EA Attia, A Megahed, P Duquenne
IFAC-PapersOnLine 49 (12), 1086-1091, 2016
62016
Apport méthodologique à la conception et mise en œuvre des projets: application aux projets d'établissement d'une entreprise a l'étranger
A Sandoval-Correa
Toulouse, INPT, 2006
4*2006
Aggregate production planning considering performance evolution: a case study
EA Attia, A Megahed, S Baioumy, A Elbetar, P Duquenne
Proceedings of the 17th int. AMME Conference, 0, 2016
32016
Decision-Based Genetic Algorithms for Solving Multi-period Project Scheduling with Dynamically Experienced Workforce
P Duquenne, JM Le Lann
9th International Conference on Modeling, Optimization & SIMulation, 2012
32012
Il sistema al momento non può eseguire l'operazione. Riprova più tardi.
Articoli 1–20