Segui
Pramen P Shrestha
Pramen P Shrestha
Chair and Professor, Civil & Environmental Engineering & Construction, University of
Email verificata su unlv.edu - Home page
Titolo
Citata da
Citata da
Anno
An empirical comparison of design/build and design/bid/build project delivery methods
DR Hale, PP Shrestha
Journal of Construction Engineering and Management 135 (7), 12, 2009
4302009
Performance comparison of large design-build and design-bid-build highway projects
PP Shrestha, JT O’Connor, GE Gibson Jr
Journal of construction engineering and management 138 (1), 1-13, 2012
2252012
Hard‐hat detection for construction safety visualization
K Shrestha, PP Shrestha, D Bajracharya, EA Yfantis
Journal of Construction Engineering 2015 (1), 721380, 2015
1422015
Carbon footprint of water conveyance versus desalination as alternatives to expand water supply
E Shrestha, S Ahmad, W Johnson, P Shrestha, JR Batista
Desalination 280 (1-3), 33-43, 2011
1342011
Magnitude of construction cost and schedule overruns in public work projects
PP Shrestha, LA Burns, DR Shields
Journal of Construction Engineering 2013 (1), 935978, 2013
1182013
Benchmarking of large design–build highway projects: One-to-one comparison and comparison with design–bid–build projects
PP Shrestha, GC Migliaccio, JT O'Connor, GE Gibson Jr
Transportation research record 1994 (1), 17-25, 2007
922007
An Investigation of Construction Workforce Inequalities and Biases in the Architecture, Engineering, and Construction (AEC) Industry
JO Choi, PP Shrestha, J Lim, BK Shrestha
Construction Research Congress 2018, 65-75, 2018
87*2018
Investigating Causes of Delay in US Construction Projects.
M Tafazzoli, PP Shrestha
862017
Performance of Design-Build and Design-Bid-Build Projects for Public Universities
PP Shrestha, JD Fernane
Journal of Construction Engineering and Management 143 (3), 04016101, 2017
762017
Employment and wage distribution investigation in the construction industry by gender
BK Shrestha, JO Choi, PP Shrestha, J Lim, S Nikkhah Manesh
Journal of Management in Engineering 36 (4), 06020001, 2020
552020
Effects of change orders on cost growth, schedule growth, and construction intensity of large highway projects
PP Shrestha, R Maharjan
Journal of legal affairs and dispute resolution in engineering and …, 2018
532018
Impact of design cost on project performance of design-bid-build road projects
PP Shrestha, N Mani
Journal of Management in Engineering 30 (3), 04014007, 2014
522014
Factor Analysis of Construction Delays in the US Construction Industry
M Tafazzoli, P Shrestha
International Conference on Sustainable Infrastructure 2017, 111-122, 2017
492017
Spatial analysis of the gender wage gap in architecture, civil engineering, and construction occupations in the United States
SN Manesh, JO Choi, BK Shrestha, J Lim, PP Shrestha
Journal of Management in Engineering 36 (4), 04020023, 2020
472020
Correlating bid price with the number of bidders and final construction cost of public street projects
PP Shrestha, N Pradhananga
Transportation research record 2151 (1), 3-10, 2010
462010
Social marketing to plan a fall prevention program for Latino construction workers
NN Menzel, PP Shrestha
American journal of industrial medicine 55 (8), 729-735, 2012
452012
Effect of change orders on cost and schedule overruns of school building renovation projects
PP Shrestha, H Zeleke
Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2018
412018
Contributing Factors to the Punch-List Problem: Preliminary Investigation in a High-Rise Tower Project in Southern Nevada
PP Shrestha, AR Rabasto, BK Shrestha
Construction Research Congress 2018, 326-335, 2018
39*2018
Maintenance Practices for Chloride-Induced Corrosion in Reinforced-Concrete Bridge-Pier Columns
PP Shrestha, D Dhakal
Construction Research Congress 2018, 281-290, 2018
39*2018
Impacts of Change Orders on Cost and Schedule Performance and the Correlation with Project Size of DB Building Projects
PP Shrestha, M Fathi
journal of Legal Affairs and Dispute Resolution in Design and Construction …, 2019
362019
Il sistema al momento non può eseguire l'operazione. Riprova più tardi.
Articoli 1–20