Maintenance performance measurement (MPM): issues and challenges A Parida, U Kumar Journal of Quality in Maintenance Engineering 12 (3), 239-251, 2006 | 500 | 2006 |
Development of a multi‐criteria hierarchical framework for maintenance performance measurement (MPM) A Parida, G Chattopadhyay Journal of Quality in maintenance Engineering 13 (3), 241-258, 2007 | 423* | 2007 |
Maintenance performance metrics: a state‐of‐the‐art review U Kumar, D Galar, A Parida, C Stenström, L Berges Journal of Quality in Maintenance Engineering 19 (3), 233-277, 2013 | 389 | 2013 |
Complex system maintenance handbook KAH Kobbacy, DNP Murthy Springer Science & Business Media, 2008 | 356 | 2008 |
Performance measurement and management for maintenance: a literature review A Parida, U Kumar, D Galar, C Stenström Journal of Quality in Maintenance Engineering 21 (1), 2-33, 2015 | 250 | 2015 |
Preventive and corrective maintenance–cost comparison and cost–benefit analysis C Stenström, P Norrbin, A Parida, U Kumar Structure and Infrastructure Engineering 12 (5), 603-617, 2016 | 203 | 2016 |
Maintenance productivity and performance measurement A Parida, U Kumar Handbook of maintenance management and engineering, 17-41, 2009 | 141 | 2009 |
Maintenance performance indicators (MPIs) for benchmarking the railway infrastructure: a case study T Åhrén, A Parida Benchmarking: An International Journal 16 (2), 247-258, 2009 | 125 | 2009 |
Study and analysis of maintenance performance indicators (MPIs) for LKAB: A case study A Parida Journal of Quality in Maintenance Engineering 13 (4), 325-337, 2007 | 90 | 2007 |
Failure mode and effect analysis M Ben-Daya Handbook of maintenance management and engineering, 75-90, 2009 | 88 | 2009 |
Performance indicators of railway infrastructure C Stenström, A Parida, D Galar The international Journal of railway technology 1 (3), 1-18, 2012 | 62 | 2012 |
Asset management T Van der Lei, P Herder, Y Wijnia Springer, 2012 | 62 | 2012 |
Reliability analysis for degradation of locomotive wheels using parametric Bayesian approach J Lin, M Asplund, A Parida Quality and Reliability Engineering International 30 (5), 657-667, 2014 | 61 | 2014 |
Performance indicators and terminology for value driven maintenance C Stenström, A Parida, U Kumar, D Galar Journal of Quality in Maintenance Engineering 19 (3), 222-232, 2013 | 58 | 2013 |
Sustainable production process: An application of reliability, availability, and maintainability methodologies in automotive manufacturing H Soltanali, AHS Garmabaki, A Thaduri, A Parida, U Kumar, A Rohani Proceedings of the Institution of Mechanical Engineers, Part O: Journal of …, 2019 | 50 | 2019 |
Natural language processing of maintenance records data C Stenström, M Al-Jumaili, A Parida International Journal of COMADEM 18 (2), 33-37, 2015 | 49 | 2015 |
Human factor in maintenance performance measurement D Galar, C Stenström, A Parida, R Kumar, L Berges 2011 IEEE International Conference on Industrial Engineering and Engineering …, 2011 | 46 | 2011 |
Managing information is key to maintenance effectiveness A Parida, U Kumar Intelligent Maintenance Systems: 15/07/2004-17/07/2004, 2004 | 44 | 2004 |
Link and effect model for performance improvement of railway infrastructure C Stenström, A Parida, D Galar, U Kumar Proceedings of the Institution of Mechanical Engineers, Part F: Journal of …, 2013 | 43 | 2013 |
Operational reliability evaluation-based maintenance planning for automotive production line H Soltanali, A Rohani, M Tabasizadeh, MH Abbaspour-Fard, A Parida Quality Technology & Quantitative Management 17 (2), 186-202, 2020 | 38 | 2020 |