Optimal short term operation of a purely hydroelectric system EB Hreinsson IEEE Transactions on Power Systems 3 (3), 1072-1077, 1988 | 57 | 1988 |
Defining optimal production capacity in a purely hydroelectric power system EB Hreinsson, LA Barroso 2004 IEEE International Conference on Electric Utility Deregulation …, 2004 | 24 | 2004 |
Optimal sizing of projects in a hydro-based power system EB Hreinsson IEEE Transactions on Energy Conversion 5 (1), 32-38, 1990 | 24 | 1990 |
Economies of scale and optimal selection of hydroelectric projects EB Hreinsson DRPT2000. International Conference on Electric Utility Deregulation and …, 2000 | 18 | 2000 |
Hydroelectric project sequencing using heuristic techniques and dynamic programming EB Hreinsson 9th. Power Systems Computation Conference, 1987 | 17 | 1987 |
Renewable Energy Resources in Iceland–Environmental Policy and Economic Value EB Hreinsson An invited paper Proc. of the Nordic Conference on Production and Use of …, 2008 | 15 | 2008 |
Supply adequacy issues in renewable energy and hydro-based power systems EB Hreinsson 2006 International Conference on Power System Technology, 1-6, 2006 | 15 | 2006 |
Monte Carlo based risk analysis in Hydroelectric Power System Expansion Planning in the presence of uncertainty in project cost and capacity EB Hreinsson, K Jónasson 38th International Universities Power Engineering Conference (UPEC …, 2003 | 14 | 2003 |
Proposed iceland/uk (peterhead) 1.2 gw hvdc cable TJ Hammons, EB Hreinsson, P Kacejko 45th International Universities Power Engineering Conference UPEC2010, 1-9, 2010 | 11 | 2010 |
Environmental, technical, economics and policy issues of the master plan for the renewable hydro and geothermal energy resources in Iceland EB Hreinsson 2007 42nd International Universities Power Engineering Conference, 726-731, 2007 | 10 | 2007 |
Iceland’s energy resources and master plan with environmental and economic constraints EB Hreinsson Proc. of Power and Energy Systems and Applications, PESA 2012 (IASTED), 12-14, 2012 | 9 | 2012 |
Deregulation, environmental and planning policy in the Icelandic renewable energy system EB Hreinsson 2007 international conference on clean electrical power, 283-290, 2007 | 9 | 2007 |
Optimal design and cost/benefit analysis of hydroelectric power systems by genetic algorithms EB Hreinsson, J Elíasson VIII Symposium of Specialists in Electrical Operations and Expansion …, 2002 | 7 | 2002 |
Electric load forecasting in a hydro-and renewable based power system EB Hreinsson 2016 13th International Conference on the European Energy Market (EEM), 1-6, 2016 | 5 | 2016 |
Operations modeling in the Iceland hydro dominated power system EB Hreinsson 2013 48th International Universities' Power Engineering Conference (UPEC), 1-6, 2013 | 5 | 2013 |
The renewable energy resources of Iceland and their extended future utilization EB Hreinsson 2009 44th International Universities Power Engineering Conference (UPEC), 1-4, 2009 | 5 | 2009 |
The economic rent in hydro and geothermal resources in iceland with reference to international energy markets and resource cost structure EB Hreinsson 2008 IEEE Power and Energy Society General Meeting-Conversion and Delivery …, 2008 | 5 | 2008 |
Computerisation of the Icelandic State and Municipalities: From 1964 to 1985 O Benediktsson, J Gunnarsson, EB Hreinsson, J Jakobsson, Ö Kaldalóns, ... IFIP Conference on History of Nordic Computing, 45-60, 2003 | 5 | 2003 |
Optimal long term hydro scheduling linked to average electricity market prices EB Hreinsson 2016 13th International Conference on the European Energy Market (EEM), 1-7, 2016 | 4 | 2016 |
Incremental cost and allocation of hydro-resources to energy intensive industries EB Hreinsson Conference Record of the 2000 IEEE Industry Applications Conference. Thirty …, 2000 | 4 | 2000 |