Segui
Lars Herre
Lars Herre
Postdoc in Electrical Engineering, DTU Danmarks Tekniske Universitet
Email verificata su elektro.dtu.dk - Home page
Titolo
Citata da
Citata da
Anno
Nordic balancing markets: Overview of market rules
A Khodadadi, L Herre, P Shinde, R Eriksson, L Söder, M Amelin
2020 17th International Conference on the European Energy Market (EEM), 1-6, 2020
822020
Simplified model of integrated paper mill for optimal bidding in energy and reserve markets
L Herre, F Tomasini, K Paridari, L Söder, L Nordström
Applied Energy 279, 115857, 2020
232020
Neural networks for GEFCom2017 probabilistic load forecasting
I Dimoulkas, P Mazidi, L Herre
International Journal of Forecasting 35 (4), 1409-1423, 2019
202019
Design of a continuous local flexibility market with network constraints
E Prat, L Herre, J Kazempour, S Chatzivasileiadis
2021 IEEE Madrid PowerTech, 1-6, 2021
182021
Impact of market timing on the profit of a risk-averse load aggregator
L Herre, JL Mathieu, L Söder
IEEE Transactions on Power Systems 35 (5), 3970-3980, 2020
162020
Optimal Day-Ahead Energy and Regulation Self-Scheduling of a Risk-Averse Electric vehicle Aggregator in the Nordic Market
L Herre, J Dalton, L Söder
PowerTech, 2019
14*2019
Exploring wind power prognosis data on Nord Pool: the case of Sweden and Denmark
L Herre, T Matusevičius, J Olauson, L Söder
IET Renewable Power Generation 13 (5), 690-702, 2019
132019
Flexibility chart 2.0: An accessible visual tool to evaluate flexibility resources in power systems
Y Yasuda, EM Carlini, A Estanqueiro, PB Eriksen, D Flynn, LF Herre, ...
Renewable and Sustainable Energy Reviews 174, 113116, 2023
122023
Network-aware flexibility requests for distribution-level flexibility markets
E Prat, I Dukovska, R Nellikkath, M Thoma, L Herre, S Chatzivasileiadis
IEEE Transactions on Power Systems 39 (2), 2641-2652, 2023
102023
A hybrid model based on symbolic regression and neural networks for electricity load forecasting
I Dimoulkas, L Herre, D Khastieva, E Nycander, M Amelin, P Mazidi
2018 15th International Conference on the European Energy Market (EEM), 1-5, 2018
102018
On the electromagnetic coupling of AC and DC circuits on hybrid transmission towers
L Herre, P Wouters, F Steennis, R de Graaff
2016 IEEE International Energy Conference (ENERGYCON), 1-6, 2016
102016
The flexibility of thermostatically controlled loads as a function of price notice time
L Herre, L Söder, JL Mathieu
2018 Power Systems Computation Conference (PSCC), 1-7, 2018
92018
Impact of imbalance settlement system design on risk-averse energy storage
L Herre
2020 17th International Conference on the European Energy Market (EEM), 1-6, 2020
82020
On the flexibility of electricity consumers: Introducing notice time
L Herre, L Söder
2016 13th International Conference on the European Energy Market (EEM), 1-5, 2016
72016
Quantifying flexibility of load aggregations: impact of communication constraints on reserve capacity
L Herre, S Kazemi, L Söder
IET Generation, Transmission & Distribution 14 (22), 5211-5218, 2020
62020
Optimal Day-Ahead Bidding of a Risk-Averse Pulp and Paper Mill in the Energy and Reserve Market
L Herre, F Tomasini, K Paridari
2019 16th International Conference on the European Energy Market (EEM), 1-5, 2019
52019
EEM 2017 Forecast Competition: Wind power generation prediction using autoregressive models
I Dimoulkas, P Mazidi, L Herre
2017 14th International Conference on the European Energy Market (EEM), 1-6, 2017
52017
Reliability-aware probabilistic reserve procurement
L Herre, P Pinson, S Chatzivasileiadis
Electric Power Systems Research 212, 108345, 2022
42022
Flexibility now or later?–Impact of market timing on flexibility and social welfare of demand response
L Herre, T Kovala, L Söder, C Lindh
The Electricity Journal 35 (7), 107159, 2022
42022
FLEXGRID–A novel smart grid architecture that facilitates high-RES penetration through innovative flexibility markets towards efficient stakeholder interaction
N Efthymiopoulos, P Makris, G Tsaousoglou, K Steriotis, DJ Vergados, ...
Open Research Europe 1, 2021
32021
Il sistema al momento non può eseguire l'operazione. Riprova più tardi.
Articoli 1–20