Multicriteria scheduling: theory, models and algorithms V T'kindt, JC Billaut Springer Science & Business Media, 2006 | 1010 | 2006 |
An ant colony optimization algorithm to solve a 2-machine bicriteria flowshop scheduling problem V T'kindt, N Monmarché, F Tercinet, D Laügt European Journal of Operational Research 142 (2), 250-257, 2002 | 271 | 2002 |
Metaheuristics for multiobjective optimisation X Gandibleux, M Sevaux, K Sörensen, V T'kindt Springer Science & Business Media, 2012 | 138 | 2012 |
Multicriteria scheduling problems: a survey V T'kindt, JC Billaut RAIRO-Operations Research 35 (2), 143-163, 2001 | 124 | 2001 |
A recovering beam search algorithm for the one-machine dynamic total completion time scheduling problem F Della Croce, V T'kindt Journal of the Operational Research Society 53 (11), 1275-1280, 2002 | 109 | 2002 |
A two-stage robustness approach to evacuation planning with buses M Goerigk, K Deghdak, V T’Kindt Transportation Research Part B: Methodological 78, 66-82, 2015 | 85 | 2015 |
Two-machine flowshop scheduling with a secondary criterion V T'kindt, JND Gupta, JC Billaut Computers & Operations Research 30 (4), 505-526, 2003 | 73 | 2003 |
3D numerical modeling of the propagation of hydraulic fracture at its intersection with natural (pre-existing) fracture AN Dehghan, K Goshtasbi, K Ahangari, Y Jin, A Bahmani Rock Mechanics and Rock Engineering 50, 367-386, 2017 | 71 | 2017 |
Rescheduling for new orders on a single machine with setup times H Hoogeveen, C Lenté, V T’kindt European Journal of Operational Research 223 (1), 40-46, 2012 | 66 | 2012 |
An ant colony optimisation algorithm for the set packing problem X Gandibleux, X Delorme, V T’Kindt International Workshop on Ant Colony Optimization and Swarm Intelligence, 49-60, 2004 | 62 | 2004 |
Multiobjective programming and goal programming: theoretical results and practical applications V Barichard, X Gandibleux, V T'Kindt Springer Science & Business Media, 2009 | 55 | 2009 |
Lecture Notes in Economics and Mathematical Systems 591 M Beckmann, HP Künzi, G Fandel, W Trockel | 55* | 1974 |
Scheduling two agents on uniform parallel machines with makespan and cost functions D Elvikis, HW Hamacher, V T’kindt Journal of Scheduling 14, 471-481, 2011 | 51 | 2011 |
A recovering beam search algorithm for the single machine just-in-time scheduling problem B Estève, C Aubijoux, A Chartier, V T’kindt European Journal of Operational Research 172 (3), 798-813, 2006 | 46 | 2006 |
A Multicriteria Dial‐a‐Ride Problem with an Ecological Measure and Heterogeneous Vehicles A Atahran, C Lenté, V T'kindt Journal of Multi‐Criteria Decision Analysis 21 (5-6), 279-298, 2014 | 45 | 2014 |
Two-agent scheduling on uniform parallel machines with min-max criteria D Elvikis, V T’kindt Annals of Operations Research 213 (1), 79-94, 2014 | 44 | 2014 |
Sequencing a single machine with due dates and deadlines: an ILP-based approach to solve very large instances P Baptiste, F Della Croce, A Grosso, V T’kindt Journal of Scheduling 13, 39-47, 2010 | 41 | 2010 |
Solving a bicriteria scheduling problem on unrelated parallel machines occurring in the glass bottle industry V T'kindt, JC Billaut, C Proust European Journal of Operational Research 135 (1), 42-49, 2001 | 40 | 2001 |
Revisiting branch and bound search strategies for machine scheduling problems V T'kindt, FD Croce, C Esswein Journal of Scheduling 7, 429-440, 2004 | 37 | 2004 |
A hybrid heuristic approach for single machine scheduling with release times F Della Croce, F Salassa, V T'kindt Computers & Operations Research 45, 7-11, 2014 | 29 | 2014 |