Segui
Micah Nehring
Micah Nehring
Lecturer in Mining Engineering, The University of Queensland
Email verificata su uq.edu.au - Home page
Titolo
Citata da
Citata da
Anno
A comparison of strategic mine planning approaches for in-pit crushing and conveying, and truck/shovel systems
M Nehring, PF Knights, MS Kizil, E Hay
International journal of mining science and technology 28 (2), 205-214, 2018
1032018
Integrated short-and medium-term underground mine production scheduling
M Nehring, E Topal, M Kizil, P Knights
Journal of the Southern African Institute of Mining and Metallurgy 112 (5 …, 2012
772012
Adjusted real option valuation to maximise mining project value–a case study using century mine
S Shafiee, E Topal, M Nehring
Project Evaluation Conference, 125-134, 2009
732009
A new mathematical programming model for production schedule optimization in underground mining operations
M Nehring, E Topal, J Little
Journal of the Southern African Institute of Mining and Metallurgy 110 (8 …, 2010
712010
Dynamic short term production scheduling and machine allocation in underground mining using mathematical programming
M Nehring, E Topal, P Knights
Mining Technology 119 (4), 212-220, 2010
692010
A local branching heuristic for the open pit mine production scheduling problem
M Samavati, D Essam, M Nehring, R Sarker
European Journal of Operational Research 257 (1), 261-271, 2017
602017
An investigation into the impact of mine closure and its associated cost on life of mine planning and resource recovery
M Nehring, X Cheng
Journal of Cleaner Production 127, 228-239, 2016
562016
Production schedule optimisation in underground hard rock mining using mixed integer programming
M Nehring, E Topal
Project evaluation conference, 169-175, 2007
562007
Selection and planning of fully mobile in-pit crusher and conveyor systems for deep open pit metalliferous applications
M Dean, P Knights, MS Kizil, M Nehring
AusIMM 2015 3rd International Future Mining Conference, Sydney, NSW …, 2015
542015
Truck and shovel versus in-pit conveyor systems: a comparison of the valuable operating time
I Dzakpata, P Knights, MS Kizil, M Nehring, SM Aminossadati
University of Wollongong, 2016
532016
The integrated optimization of underground stope layout designing and production scheduling incorporating a non-dominated sorting genetic algorithm (NSGA-II)
S Foroughi, JK Hamidi, M Monjezi, M Nehring
Resources Policy 63, 101408, 2019
482019
A new methodology for the open-pit mine production scheduling problem
M Samavati, D Essam, M Nehring, R Sarker
Omega 81, 169-182, 2018
452018
A methodology for the large-scale multi-period precedence-constrained knapsack problem: an application in the mining industry
M Samavati, D Essam, M Nehring, R Sarker
International Journal of Production Economics 193, 12-20, 2017
452017
Production scheduling optimisation for sublevel stoping mines using mathematical programming: A review of literature and future directions
F Sotoudeh, M Nehring, M Kizil, P Knights, A Mousavi
Resources Policy 68, 101809, 2020
362020
A new mixed-integer programming model for mine production scheduling optimisation in sublevel stope mining
J Little, M Nehring, E Topal
Proceedings-Australian Mining Technology Conference. Twin Waters. The …, 2008
332008
Production planning and scheduling in mining scenarios under IPCC mining systems
M Samavati, D Essam, M Nehring, R Sarker
Computers & Operations Research 115, 104714, 2020
302020
Operating value optimisation using simulation and mixed integer programming
A Salama, M Nehring, J Greberg
International Journal of Mining, Reclamation and Environment 28 (1), 25-46, 2014
302014
Evaluation of the impact of commodity price change on mine plan of underground mining
A Salama, M Nehring, J Greberg
International Journal of Mining Science and Technology 25 (3), 375-382, 2015
282015
Integrated underground mining and pre-concentration systems; a critical review of technical concepts and developments
F Sotoudeh, M Nehring, M Kizil, P Knights
International Journal of Mining, Reclamation and Environment 35 (3), 153-182, 2021
272021
Integrated optimization of stope boundary selection and scheduling for sublevel stoping operations
T Copland, M Nehring
Journal of the Southern African Institute of Mining and Metallurgy 116 (12 …, 2016
262016
Il sistema al momento non può eseguire l'operazione. Riprova più tardi.
Articoli 1–20