Segui
Dr. Jotindra  Nath  Roul
Dr. Jotindra Nath Roul
Altri nomiJ N Roul
Email verificata su visva-bharati.ac.in - Home page
Titolo
Citata da
Citata da
Anno
Multi-item reliability dependent imperfect production inventory optimal control models with dynamic demand under uncertain resource constraint
JN Roul, K Maity, S Kar, M Maiti
International Journal of Production Research 53 (16), 4993-5016, 2015
392015
Optimal control problem for an imperfect production process using fuzzy variational principle
JN Roul, K Maity, S Kar, M Maiti
Journal of Intelligent & Fuzzy Systems 32 (1), 565-577, 2017
112017
Multi-item Optimal control problem with fuzzy costs and constraints using Fuzzy variational principle
JN Roul, K Maity, S Kar, M Maiti
RAIRO-Operations Research 53 (3), 1061-1082, 2019
72019
Optimal Control of Complementary and Substitute Items in a Production System for Infinite Time Horizon
JN Roul, K Maity, S Kar, M Maiti
Engineering Mathematics and Computing 1042, 117-141, 2022
22022
Optimal time-dependent production policy under random time horizon
JN Roul, K Maity, S Kar, M Maiti
OPSEARCH, 391–413, 2019
12019
Optimum Production through variational principle with the time quadratic demand, fuzzy time period and fuzzy integrand
JN Roul, K Maity, S Kar, M Maiti
arXiv preprint arXiv:2309.09027, 2023
2023
Optimum Production for a heaped stock dependent breakable item through variational principle
JN Roul, K Maity, S Kar, M Maiti
http://arxiv.org/abs/2006.01740, 2020
2020
A Multi-item Imperfect Optimal Production Problem Through Chebyshev Approximation
JN Roul, K Maity, S Kar, M Maiti
Studies in Computational Intelligence 863, 481-493, 2019
2019
Review on Optimal Control Problems for Bio-Mathematics in Uncertain Environments
JN Roul, UK Bera, S Kar, M Maiti
http://www.narosa.com/books_display.asp?catgcode=978-81-8487-523-2, 2015
2015
Il sistema al momento non può eseguire l'operazione. Riprova più tardi.
Articoli 1–9