Ikuti
Juliastuti, Yuliastuti
Judul
Dikutip oleh
Dikutip oleh
Tahun
The Agrivoltaic System Development in Baron Technopark, Yogyakarta, Indonesia
K Ahmad, Y Wijayanti, A Subandriya, T Setyorini, S Mukhid, RB Prasetyo
2022 5th Asia Conference on Energy and Electrical Engineering (ACEEE), 147-151, 2022
192022
Clash detection analysis with BIM-based software on midrise building construction project
AAP D M Savitri, Juliastuti
IOP Conf. Series: Earth and Environmental Science 426 (Eco Engineering), 012002, 2020
192020
Water-energy nexus development for sustainable water management in Indonesia
OS Yureana Wijayanti, Martin Anda, Lisma Safitri, Samsuri Tarmadja, Juliastuti
IOP Conf. Series: Earth and Environmental Science 426 (Eco Engineering), 012058, 2020
172020
Cost and time analysis on the selection of formwork installation method
P Arumsari, C Xavier
IOP Conference Series: Earth and Environmental Science 426 (1), 012042, 2020
152020
Realtime monitoring study for highway construction using Unmanned Aerial Vehicle (UAV) technology
F Riyanto, O Setyandito, A Pramudya
IOP Conference Series: Earth and Environmental Science 729 (1), 012040, 2021
92021
Shoreline change with groin coastal protection structure at North Java Beach
O Setyandito, AC Purnama, N Yuwono, J Juliastuti, Y Wijayanti
ComTech: Computer, Mathematics and Engineering Applications 11 (1), 19-28, 2020
92020
The effect of bridge abutment shape variation toward flow velocity characteristic
YW Oki Setyandito, R. D Alexander Michael, Juliastuti, J.P Andrew
IOP Conf. Series: Earth and Environmental Science 426 (Eco Engineering), 012035, 2020
82020
Analysis of clash detection and quantity take-off using BIM for warehouse construction
MR Elyano
IOP Conference Series: Earth and Environmental Science 794 (1), 012012, 2021
72021
FJ. Mock Method for Hydrological model in Water Reliability Study at Jatiluhur Estate, Purwakarta
PA Setiadi, Y Wijayanti, C Cahyono
IOP Conference Series: Earth and Environmental Science 998 (1), 012003, 2022
62022
Numerical analysis of velocity magnitude on wave energy converter system in perforated breakwater
O Setyandito, N Nizam, AJ Pierre, GD Putra, Y Wijayanti, M Anda
International Journal of Renewable Energy Development 11 (1), 27-33, 2021
52021
Dam Failure Model to Predict Inundation Hazard Map for Emergency Plan
S Juliastuti, Alisjahbana, Ma’soem, Setyandito
International Journal of Engineering and Advanced Technology (IJEAT) 9 …, 2019
5*2019
Temperature effect on cable tension forces of cable-stayed bridge
C Made Suangga, Irpan Hidayat, Juliastuti
IOP Conf. Series: Earth and Environmental Science 195 (Eco Engineering), 2018
52018
Spatial Data and Catchment Discretization for Assessment Coastal Urban Drainage Performance Using GIS and MIKE URBAN-SWMM
OS Juliastuti, Putri Arumsari
IOP Conf. Series: Earth and Environmental Science 195 (Eco Engineering), 2018
5*2018
The assessment of drainage performance in the residential area using SWMM
ISDS Juliastuti, Timotius Kurniawan Wihartono, Oki Setyandito, Yureana ...
SINERGI 27 (Water Resources Management), 281-288, 2023
42023
A study on agriculture water sustainability using the water footprint
Y Wijayanti, L Safitri, RA Kusumadewi, O Setyandito, K Budihardjo
AIP Conference Proceedings 2706 (1), 2023
42023
Flow characteristics investigation on trapezoidal weir using FLOW 3D
O Setyandito, S Christian, RT Lopa
IOP Conference Series: Earth and Environmental Science 998 (1), 012013, 2022
42022
Saline water desalination using solar energy: performance analysis and implementation barriers
RA Kusumadewi, Y Wijayanti, M Fittkow
IOP Conference Series: Earth and Environmental Science 894 (1), 012020, 2021
42021
Qualitative assessment of deterioration embankment dam using index condition and annual probability of failure (APF) using event tree method
B Thoyibahri, C Cahyono, O Setyandito
IOP Conference Series: Earth and Environmental Science 794 (1), 012060, 2021
42021
Dam break analysis and flood inundation map of Krisak dam for emergency action plan
J Juliastuti, O Setyandito
AIP Conference Proceedings 1903 (1), 2017
42017
Integration building information modeling (BIM) to track the time for controlling of budget and labor productivity (case study: warehouse project)
RW Wicaksono, P Arumsari
IOP Conference Series: Earth and Environmental Science 794 (1), 012037, 2021
32021
Sistem tidak dapat melakukan operasi ini. Coba lagi nanti.
Artikel 1–20