Ikuti
Richard Martin Lusby
Richard Martin Lusby
Associate Professor, Management Science, DTU Management Engineering, Technical University of
Email yang diverifikasi di dtu.dk
Judul
Dikutip oleh
Dikutip oleh
Tahun
Railway track allocation: models and methods
RM Lusby, J Larsen, M Ehrgott, D Ryan
OR spectrum 33, 843-883, 2011
4612011
Models for the discrete berth allocation problem: A computational comparison
K Buhrkal, S Zuglian, S Ropke, J Larsen, R Lusby
Transportation Research Part E: Logistics and Transportation Review 47 (4 …, 2011
2382011
Electric bus planning & scheduling: A review of related problems and methodologies
SSG Perumal, RM Lusby, J Larsen
European Journal of Operational Research 301 (2), 395-413, 2022
2022022
A survey on robustness in railway planning
RM Lusby, J Larsen, S Bull
European Journal of Operational Research 266 (1), 1-15, 2018
1842018
A set packing inspired method for real-time junction train routing
RM Lusby, J Larsen, M Ehrgott, DM Ryan
Computers & Operations Research 40 (3), 713-724, 2013
1062013
Integrating robust timetabling in line plan optimization for railway systems
S Burggraeve, SH Bull, P Vansteenwegen, RM Lusby
Transportation Research Part C: Emerging Technologies 77, 134-160, 2017
992017
Rolling stock scheduling with maintenance requirements at the Chinese High-Speed Railway
Q Zhong, RM Lusby, J Larsen, Y Zhang, Q Peng
Transportation Research Part B: Methodological 126, 24-44, 2019
902019
Routing trains through railway junctions: a new set-packing approach
R Lusby, J Larsen, D Ryan, M Ehrgott
Transportation Science 45 (2), 228-245, 2011
852011
A branch-and-price algorithm for railway rolling stock rescheduling
RM Lusby, JT Haahr, J Larsen, D Pisinger
Transportation Research Part B: Methodological 99, 228-250, 2017
812017
Meta-analysis of metaheuristics: Quantifying the effect of adaptiveness in adaptive large neighborhood search
R Turkeš, K Sörensen, LM Hvattum
European Journal of Operational Research 292 (2), 423-442, 2021
752021
A column generation approach for solving the patient admission scheduling problem
TM Range, RM Lusby, J Larsen
European Journal of Operational Research 235 (1), 252-264, 2014
682014
Solution approaches for integrated vehicle and crew scheduling with electric buses
SSG Perumal, T Dollevoet, D Huisman, RM Lusby, J Larsen, M Riis
Computers & Operations Research 132, 105268, 2021
612021
An adaptive large neighborhood search procedure applied to the dynamic patient admission scheduling problem
RM Lusby, M Schwierz, TM Range, J Larsen
Artificial intelligence in medicine 74, 21-31, 2016
522016
An exact method for the double TSP with multiple stacks
RM Lusby, J Larsen, M Ehrgott, D Ryan
International Transactions in Operational Research 17 (5), 637-652, 2010
522010
Tramp ship routing and scheduling with integrated bunker optimization
C Vilhelmsen, R Lusby, J Larsen
EURO Journal on Transportation and Logistics 3 (2), 143-175, 2014
502014
Optimization methods for the train unit shunting problem
JT Haahr, RM Lusby, JC Wagenaar
European Journal of Operational Research 262 (3), 981-995, 2017
482017
Simultaneously re-optimizing timetables and platform schedules under planned track maintenance for a high-speed railway network
Q Zhang, RM Lusby, P Shang, X Zhu
Transportation Research Part C: Emerging Technologies 121, 102823, 2020
452020
Integrating rolling stock scheduling with train unit shunting
J Haahr, RM Lusby
European Journal of Operational Research 259 (2), 452-468, 2017
432017
A hybrid column generation approach for an industrial waste collection routing problem
K Hauge, J Larsen, RM Lusby, E Krapper
Computers & Industrial Engineering 71, 10-20, 2014
422014
A solution approach based on Benders decomposition for the preventive maintenance scheduling problem of a stochastic large-scale energy system
R Lusby, LF Muller, B Petersen
Journal of Scheduling 16, 605-628, 2013
422013
Sistem tidak dapat melakukan operasi ini. Coba lagi nanti.
Artikel 1–20