Suivre
Jei-Zheng Wu (吳吉政)
Jei-Zheng Wu (吳吉政)
Distinguished Professor, Department of Business Administration, Soochow University, Taipei, Taiwan
Adresse e-mail validée de scu.edu.tw - Page d'accueil
Titre
Citée par
Citée par
Année
A sustainable production-inventory model for a controllable carbon emissions rate under shortages
U Mishra, JZ Wu, B Sarkar
Journal of Cleaner Production 256, 120268, 2020
2492020
Optimum sustainable inventory management with backorder and deterioration under controllable carbon emissions
U Mishra, JZ Wu, B Sarkar
Journal of Cleaner Production 279, 123699, 2021
2082021
Sustainable inventory system with controllable non-instantaneous deterioration and environmental emission rates
U Mishra, JZ Wu, YC Tsao, ML Tseng
Journal of Cleaner Production 244, 118807, 2020
1122020
Modeling strategic semiconductor assembly outsourcing decisions based on empirical settings
JZ Wu, CF Chien
Or Spectrum 30, 401-430, 2008
702008
Key factors for truly sustainable supply chain management: An investigation of the coal industry in Indonesia
JZ Wu, CH Santoso, J Roan
The International Journal of Logistics Management 28 (4), 1196-1217, 2017
642017
A novel bi-vector encoding genetic algorithm for the simultaneous multiple resources scheduling problem
JZ Wu, XC Hao, CF Chien, M Gen
Journal of Intelligent Manufacturing 23, 2255-2270, 2012
622012
Coordinating strategic outsourcing decisions for semiconductor assembly using a bi-objective genetic algorithm
JZ Wu, CF Chien, M Gen
International Journal of Production Research 50 (1), 235-260, 2012
612012
Modeling semiconductor testing job scheduling and dynamic testing machine configuration
JZ Wu, CF Chien
Expert Systems with Applications 35 (1-2), 485-496, 2008
592008
Constructing the OGE for promoting tool group productivity in semiconductor manufacturing
CF Chien, HK Chen, JZ Wu, CH Hu
International Journal of Production Research 45 (3), 509-524, 2007
582007
Examining consumer’s intention to adopt AI-chatbots in tourism using partial least squares structural equation modeling method
F Rafiq, N Dogra, M Adil, JZ Wu
Mathematics 10 (13), 2190, 2022
562022
The cooperative estimation of distribution algorithm: a novel approach for semiconductor final test scheduling problems
XC Hao, JZ Wu, CF Chien, M Gen
Journal of Intelligent Manufacturing 25, 867-879, 2014
482014
A validation scheme for intelligent and effective multiple criteria decision-making
JZ Wu, PJ Tiao
Applied Soft Computing 68, 866-872, 2018
472018
Applying analytic network process (ANP) to rank critical success factors of waterfront redevelopment
PTW Lee, JZ Wu, KC Hu, M Flynn
International Journal of Shipping and Transport Logistics 5 (4/5), 390-411, 2013
412013
Analyzing repair decisions in the site imbalance problem of semiconductor test machines
CF Chien, JZ Wu
IEEE Transactions on Semiconductor Manufacturing 16 (4), 704-711, 2003
412003
Effects of a hybrid-price-stock dependent demand on the optimal solutions of a deteriorating inventory system and trade credit policy on re-manufactured product
U Mishra, JZ Wu, ML Tseng
Journal of Cleaner Production 241, 118282, 2019
402019
Optimizing a sustainable supply chain inventory model for controllable deterioration and emission rates in a greenhouse farm
U Mishra, AHM Mashud, ML Tseng, JZ Wu
Mathematics 9 (5), 495, 2021
342021
Domain-driven actionable process model discovery
BN Yahya, M Song, H Bae, S Sul, JZ Wu
Computers & Industrial Engineering 99, 382-400, 2016
322016
Attention-based STL-BiLSTM network to forecast tourist arrival
M Adil, JZ Wu, RK Chakrabortty, A Alahmadi, MF Ansari, MJ Ryan
Processes 9 (10), 1759, 2021
312021
A two-stage stochastic programming approach for new tape-out allocation decisions for demand fulfillment planning in semiconductor manufacturing
CF Chien, JZ Wu, CC Wu
Flexible Services and Manufacturing Journal 25 (3), 286-309, 2013
312013
Inventory write-down prediction for semiconductor manufacturing considering inventory age, accounting principle, and product structure with real settings
JZ Wu
Computers & Industrial Engineering 65 (1), 128-136, 2013
262013
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20