Suivre
Llewellyn Tang, PhD
Llewellyn Tang, PhD
MetaBIM Research Lab, The University of Hong Kong, Associate Professor in BIM, BSc(First Class Hons
Adresse e-mail validée de hku.hk - Page d'accueil
Titre
Citée par
Citée par
Année
A review of air filtration technologies for sustainable and healthy building ventilation
G Liu, M Xiao, X Zhang, C Gal, X Chen, L Liu, S Pan, J Wu, L Tang, ...
Sustainable cities and society 32, 375-396, 2017
3532017
A review of thermal absorbers and their integration methods for the combined solar photovoltaic/thermal (PV/T) modules
J Wu, X Zhang, J Shen, Y Wu, K Connelly, T Yang, L Tang, M Xiao, Y Wei, ...
Renewable and Sustainable Energy Reviews 75, 839-854, 2017
1602017
BIM-based integrated management workflow design for schedule and cost planning of building fabric maintenance
C Chen, L Tang
Automation in construction 107, 102944, 2019
1432019
BIM investment, returns, and risks in China’s AEC industries
R Jin, CM Hancock, L Tang, D Wanatowski
Journal of Construction Engineering and Management 143 (12), 04017089, 2017
1432017
Empirical study of BIM implementation–based perceptions among Chinese practitioners
R Jin, C Hancock, L Tang, C Chen, D Wanatowski, L Yang
Journal of management in engineering 33 (5), 04017025, 2017
1342017
Cup-of-Water theory: A review on the interaction of BIM, IoT and blockchain during the whole building lifecycle
Z Ye, M Yin, L Tang, H Jiang
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2018
1112018
Project-based pedagogy in interdisciplinary building design adopting BIM
R Jin, T Yang, P Piroozfar, BG Kang, D Wanatowski, CM Hancock, L Tang
Engineering, Construction and Architectural Management 25 (10), 1376-1397, 2018
1042018
High value information in engineering organisations
Y Zhao, LCM Tang, MJ Darlington, SA Austin, SJ Culley
International Journal of Information Management 28 (4), 246-258, 2008
872008
Application of the entropy technique and genetic algorithms to construction site layout planning of medium‐size projects
KC Lam, CM Tang, WC Lee
Construction Management and Economics 23 (2), 127-145, 2005
682005
A review on recent development of cooling technologies for concentrated photovoltaics (CPV) systems
M Xiao, L Tang, X Zhang, IYF Lun, Y Yuan
Energies 11 (12), 3416, 2018
662018
Barriers and policy recommendations for developing green buildings from local government perspective: a case study of Ningbo China
W Deng, T Yang, L Tang, YT Tang
Intelligent Buildings International 10 (2), 61-77, 2018
572018
Identifying design development factors in Australian PPP projects using an AHP framework
P Raisbeck, LCM Tang
Construction Management and Economics 31 (1), 20-39, 2013
542013
Investigation into the current stage of BIM application in China’s AEC industries
R Jin, L Tang, K Fang
WIT Transactions on The Built Environment 149, 493-503, 2015
492015
An indoor environment monitoring system using low-cost sensor network
O Bamodu, L Xia, L Tang
Energy Procedia 141, 660-666, 2017
432017
An entropy-based SWOT evaluation process of critical success factors for international market entry: A case study of a medium-sized consulting company
LCM Tang, B Atkinson, RR Zou
Construction Management and Economics 30 (10), 821-834, 2012
432012
Simulating construction duration for multistory buildings with controlling activities
LD Nguyen, DH Phan, LCM Tang
Journal of Construction Engineering and Management 139 (8), 951-959, 2013
412013
Smart meter and in-home display for energy savings in residential buildings: a pilot investigation in Shanghai, China
X Zhang, J Shen, T Yang, L Tang, L Wang, Y Liu, P Xu
Intelligent Buildings International 11 (1), 4-26, 2019
402019
A numerical simulation of air distribution in an office room ventilated by 4-way cassette air-conditioner
O Bamodu, L Xia, L Tang
Energy Procedia 105, 2506-2511, 2017
382017
Cost estimation in building information models
S Xu, K Liu, LCM Tang
ICCREM 2013: Construction and Operation in the Context of Sustainability …, 2013
372013
Launching the innovative BIM module for the architecture and built environment programme in China
L Tang, R Jin, K Fang
Building information modelling (BIM) in design, construction and operations …, 2015
362015
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20