Seguir
Babak Javadi., Assistant Professor
Babak Javadi., Assistant Professor
Otros nombresCEO Industrial Consultant
Department of Industrial Engineering, College of Farabi,University of Tehran
Dirección de correo verificada de ut.ac.ir
Título
Citado por
Citado por
Año
Supplier selection and order allocation problem using a two-phase fuzzy multi-objective linear programming
S Nazari-Shirkouhi, H Shakouri, B Javadi, A Keramati
Applied Mathematical Modelling 37 (22), 9308-9323, 2013
2042013
Design of a facility layout problem in cellular manufacturing systems with stochastic demands
R Tavakkoli-Moghaddam, N Javadian, B Javadi, N Safaei
Applied mathematics and computation 184 (2), 721-728, 2007
1822007
Designing a new mathematical model for cellular manufacturing system based on cell utilization
I Mahdavi, B Javadi, K Fallah-Alipour, J Slomp
Applied mathematics and Computation 190 (1), 662-670, 2007
1092007
Balancing of robotic mixed-model two-sided assembly line with robot setup times
M Aghajani, R Ghodsi, B Javadi
The international journal of advanced manufacturing technology 74, 1005-1016, 2014
902014
An Electromagnetism-like algorithm for cell formation and layout problem
F Jolai, R Tavakkoli-Moghaddam, A Golmohammadi, B Javadi
Expert Systems with Applications 39 (2), 2172-2182, 2012
752012
A multi-objective scatter search for a bi-criteria no-wait flow shop scheduling problem
AR Rahimi-Vahed, B Javadi, M Rabbani, R Tavakkoli-Moghaddam
Engineering Optimization 40 (4), 331-346, 2008
662008
The use of a fuzzy multi-objective linear programming for solving a multi-objective single-machine scheduling problem
R Tavakkoli-Moghaddam, B Javadi, F Jolai, A Ghodratnama
Applied soft computing 10 (3), 919-925, 2010
572010
No-wait flow shop scheduling using fuzzy multi-objective linear programming
B Javadi, M Saidi-Mehrabad, A Haji, I Mahdavi, F Jolai, N Mahdavi-Amiri
Journal of the Franklin Institute 345 (5), 452-467, 2008
442008
An integrated approach for the cell formation and layout design in cellular manufacturing systems
B Javadi, F Jolai, J Slomp, M Rabbani, R Tavakkoli-Moghaddam
International Journal of Production Research 51 (20), 6017-6044, 2013
422013
A variable neighborhood binary particle swarm algorithm for cell layout problem
F Jolai, M Taghipour, B Javadi
The International Journal of Advanced Manufacturing Technology 55, 327-339, 2011
332011
Determination of number of kanban in a cellular manufacturing system with considering rework process
M Aghajani, A Keramati, B Javadi
The International Journal of Advanced Manufacturing Technology 63, 1177-1189, 2012
322012
Solving a multi-objective mixed-model assembly line sequencing problem by a fuzzy goal programming approach
B Javadi, A Rahimi-Vahed, M Rabbani, M Dangchi
The International Journal of Advanced Manufacturing Technology 39, 975-982, 2008
292008
A two-phase linear programming methodology for fuzzy multi-objective mixed-model assembly line problem
I Mahdavi, B Javadi, N Sahebjamnia, N Mahdavi-Amiri
The International Journal of Advanced Manufacturing Technology 44, 1010-1023, 2009
242009
A hybrid electromagnetism-like algorithm for dynamic inter/intra-cell layout problem
B Javadi, F Jolai, J Slomp, M Rabbani, R Tavakkoli-Moghaddam
International Journal of Computer Integrated Manufacturing 27 (6), 501-518, 2014
232014
Solving a bi-objective cell formation problem with stochastic production quantities by a two-phase fuzzy linear programming approach
M Rabbani, F Jolai, N Manavizadeh, F Radmehr, B Javadi
The International Journal of Advanced Manufacturing Technology 58, 709-722, 2012
212012
An efficient algorithm to inter and intra-cell layout problems in cellular manufacturing systems with stochastic demands
SM Mirgorbani, F Jolai, B Javadi, R Tavakkoli-Moghaddam
International Journal of Engineering 19 (1), 67-78, 2006
172006
A new approach for mixed-model assembly line sequencing
M Rabbani, A Rahimi-Vahed, B Javadi, R Tavakkoli-Moghaddam
Operations Research Proceedings 2006: Selected Papers of the Annual …, 2007
162007
A comprehensive quadratic assignment problem for an integrated layout design of final assembly line and manufacturing feeder cells
M Rabbani, S Elahi, B Javadi
Decision Science Letters 6 (2), 165-192, 2017
102017
Solving a mixed-integer model of a single machine scheduling problem by a fuzzy goal programmingapproach.
R Tavakkoli-Moghaddam, B Javadi, N Safaei
WSEAS Transactions on Business and Economics 2 (3), 45-52, 2006
102006
A genetic approach for solving a hybrid flow shop scheduling problem
I Mahdavi, MS Mojarad, B Javadi, A Tajdin
2008 IEEE International Conference on Industrial Engineering and Engineering …, 2008
82008
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20