Dynamic economic dispatch of hybrid microgrid with energy storage using quadratic programming RS Wibowo, KR Firmansyah, NK Aryani, A Soeprijanto 2016 IEEE Region 10 Conference (TENCON), 667-670, 2016 | 40 | 2016 |
Optimal placement and sizing of distributed generation for minimize losses in unbalance radial distribution systems using quantum genetic algorithm NK Aryani, M Syai'in, A Soeprijanto, IMY Negara International Review of Electrical Engineering 9 (1), 157-164, 2014 | 28 | 2014 |
Penentuan Lokasi Gangguan Hubung Singkat pada Jaringan Distribusi 20 kV Penyulang Tegalsari Surabaya dengan Metode Impedansi Berbasis GIS (Geographic Information System) O Penangsang, NK Aryani Jurnal Teknik ITS 6 (1), B66-B71, 2017 | 20 | 2017 |
Optimal placement and sizing of distributed generation using quantum genetic algorithm for reducing losses and improving voltage profile NK Aryani, M Abdillah, IMY Negara, A Soeprijanto TENCON 2011-2011 IEEE Region 10 Conference, 108-112, 2011 | 16 | 2011 |
Economic and Emission Dispatch Pada Sistem Transmisi Jawa Bali 500 kV Berdasarkan RUPTL 2015-2024 Menggunakan Modified Artificial Bee Colony Algorithm DA Pratama, O Penangsang, NK Aryani Jurnal Teknik ITS 5 (2), 2017 | 13 | 2017 |
Manajemen Gangguan Jaringan Distribusi 20 kV Kota Surabaya berbasis Geographic Information System (GIS) menggunakan Metode Algoritma Genetika C Rochman, O Penangsang, NK Aryani Jurnal Teknik ITS 6 (1), B51-B56, 2017 | 12 | 2017 |
Dynamic OPF considering different charging and discharging cost of energy storage using mixed-integer quadratic programming RS Wibowo, FY Purnomo, NK Aryani, O Penangsang 2017 International seminar on intelligent technology and its applications …, 2017 | 11 | 2017 |
Analisis dan Evaluasi Kestabilan Tegangan dengan Metode Continuation Power Flow (CPF) pada Sistem Microgrid RS Ruzi, O Penangsang, NK Aryani Jurnal Teknik ITS 5 (2), 2017 | 10 | 2017 |
Unit commitment with non-smooth generation cost function using binary particle swarm optimization RS Wibowo, FF Utama, DFU Putra, NK Aryani 2016 International Seminar on Intelligent Technology and Its Applications …, 2016 | 10 | 2016 |
Studi Analisa Stabilitas Transien Sistem Jawa-Madura-Bali (Jamali) 500kV Setelah Masuknya Pembangkit Paiton 1000 MW Pada Tahun 2021 PP Rezky, O Penangsang, NK Aryani Jurnal Teknik ITS 5 (2), A121-A127, 2016 | 9 | 2016 |
Life-cycle cost analysis of laboratory scale micro-grid operation in power system simulation laboratory using HOMER simulation JJ Gandhi, O Penangsang, A Soeprijanto, NK Aryani 2016 International Seminar on Intelligent Technology and Its Applications …, 2016 | 9 | 2016 |
Analysis of physical and electrical characteristics of transformer oil insulation during accelerated thermal aging experiment and its lifetime estimation using arrhenius law … IMY Negara, NK Aryani, DA Asfani, D Fahmi, R Jauhari, M Wahyudi 2017 International Seminar on Intelligent Technology and Its Applications …, 2017 | 8 | 2017 |
Studi Analisis dan Mitigasi Harmonisa pada PT. Semen Indonesia Pabrik Aceh SS Sumarno, O Penangsang, NK Aryani Jurnal Teknik ITS 5 (2), 2017 | 8 | 2017 |
Determining optimal location and capacity of batteries for enhancing microgrid resilience FS Wicaksana, RS Wibowo, NK Aryani 2021 IEEE International Conference in Power Engineering Application (ICPEA …, 2021 | 7 | 2021 |
Harmonic Effect for Voltage Stability Condition in Radial Distribution System NPU Putra, A Soeprijanto, NK Aryani, DFU Putra 2019 International Seminar on Intelligent Technology and Its Applications …, 2019 | 7 | 2019 |
Studi Perbaikan Stabilitas Tegangan Sistem Jawa-Madura-Bali (Jamali) dengan Pemasangan SVC Setelah Masuknya Pembangkit 1000 MW Paiton HP Prayitno, O Penangsang, NK Aryani Jurnal Teknik ITS 5 (2), B244-B250, 2016 | 7 | 2016 |
Optimasi Penentuan Lokasi Kapasitor dan Distributed Generation (DG) Dengan Rekonfigurasi Jaringan Untuk Meningkatkan Keluaran Daya Aktif DG Pada Sistem Distribusi Radial … EP Santosa, O Penangsang, NK Aryani Jurnal Teknik ITS 5, A160-A166, 2016 | 7 | 2016 |
Optimizing Tie Switches Allocation and Sizing Distributed Generation (DG) Based on Maximize Loadability Simultaneously Using HPSO Algorithm DA Wicaksono, O Penangsang, RS Wibowo, NK Aryani, DFU Putra 2019 International Seminar on Intelligent Technology and Its Applications …, 2019 | 6 | 2019 |
Analisa Stabilitas Transien Pada Sistem Transmisi Sumatera Utara 150 kV-275 kV dengan Penambahan PLTA Batang Toru 4 x 125 MW DT Kumara, O Penangsang, NK Aryani Jurnal Teknik ITS 5 (2), B202-B206, 2016 | 6 | 2016 |
Security Constrained Unit Commitment Considering Ramp Rate and Transmission Line Losses Using Binary Particle Swarm Optimization Based on IEEE 30 Bus System NK Aryani, DFU Putra, EA Arifin, AS Daroini 2019 International Seminar on Intelligent Technology and Its Applications …, 2019 | 5 | 2019 |