Follow
Professor Nashwan Dawood
Professor Nashwan Dawood
Associate Dean, School of Science, Engineering and Design , Teesside University
Verified email at tees.ac.uk - Homepage
Title
Cited by
Cited by
Year
BIM in facilities management applications: a case study of a large university complex
M Kassem, G Kelly, N Dawood, M Serginson, S Lockley
Built Environment Project and Asset Management 5 (3), 261-277, 2015
4122015
On-demand monitoring of construction projects through a game-like hybrid application of BIM and machine learning
FP Rahimian, S Seyedzadeh, S Oliver, S Rodriguez, N Dawood
Automation in Construction 110, 103012, 2020
3122020
BIM for facilities management: Evaluating BIM standards in asset register creation and service life planning
J Patacas, N Dawood, V Vukovic, M Kassem
Journal of Information Technology in Construction, 2015
1852015
BIM for facility management: a review and a case study investigating the value and challenges
G Kelly, M Serginson, S Lockley, N Dawood, M Kassem
Proceedings of the 13th international conference on construction …, 2013
1752013
Development of workspace conflict visualization system using 4D object of work schedule
HS Moon, N Dawood, LS Kang
Advanced Engineering Informatics 28 (1), 50-65, 2014
1732014
BIM for facilities management: A framework and a common data environment using open standards
J Patacas, N Dawood, M Kassem
Automation in Construction 120, 103366, 2020
1622020
Construction workspace planning: Assignment and analysis utilizing 4D visualization technologies
N Dawood, Z Mallasi
Computer‐Aided Civil and Infrastructure Engineering 21 (7), 498-513, 2006
1522006
Development of automated communication of system for managing site information using internet technology
N Dawood, A Akinsola, B Hobbs
Automation in construction 11 (5), 557-572, 2002
1512002
Estimating project and activity duration: a risk management approach using network analysis
N Dawood
Construction Management & Economics 16 (1), 41-48, 1998
1431998
Construction workspace management: the development and application of a novel nD planning approach and tool
R Chavada, N Dawood, M Kassem
Journal of Information Technology in Construction 17, 213-236, 2012
1422012
Development of an integrated information resource base for 4D/VR construction processes simulation
N Dawood, E Sriprasert, Z Mallasi, B Hobbs
Automation in construction 12 (2), 123-131, 2003
1382003
Building information modelling: protocols for collaborative design processes
M Kassem, N Iqbal, G Kelly, S Lockley, N Dawood
Journal of Information Technology in Construction 19, 126-149, 2014
1242014
BIM and 4D planning: a holistic study of the barriers and drivers to widespread adoption
M Kassem, T Brogden, N Dawood
Journal of Construction Engineering and Project Management 2 (4), 1-10, 2012
1162012
A proposed approach to comparing the BIM maturity of countries
M Kassem, B Succar, N Dawood
30th International Conference on Applications of IT in the AEC Industry, 2013
1102013
Cost-benefit analysis of BIM-enabled design clash detection and resolution
R Chahrour, MA Hafeez, AM Ahmad, HI Sulieman, H Dawood, ...
Construction Management and Economics 39 (1), 55-72, 2021
1082021
Construction workspace management within an Industry Foundation Class-Compliant 4D tool
M Kassem, N Dawood, R Chavada
Automation in construction 52, 42-58, 2015
1002015
A wireless sensor network for intelligent building energy management based on multi communication standards-A case study
H Grindvoll, O Vermesan, T Crosbie, R Bahr, N Dawood, GM Revel
Journal of Information technology in construction 17, 43-61, 2012
1002012
Comparative study of delay factors in Libyan and the UK construction industry
A Shebob, N Dawood, RK Shah, Q Xu
Engineering, Construction and Architectural Management 19 (6), 688-712, 2012
952012
Development of 4D based performance indicators in construction industry
N Dawood, S Sikka
Engineering, Construction and Architectural Management 16 (5), 438-458, 2009
952009
Intelligence approach to production planning system for bespoke precast concrete products
V Benjaoran, N Dawood
Automation in construction 15 (6), 737-745, 2006
922006
The system can't perform the operation now. Try again later.
Articles 1–20