Joint pricing and inventory control for non-instantaneous deteriorating items with partial backlogging and time and price dependent demand R Maihami, IN Kamalabadi International Journal of Production Economics 136 (1), 116-122, 2012 | 338 | 2012 |
Location-routing problem in multimodal transportation network with time windows and fuzzy demands: Presenting a two-part genetic algorithm S Fazayeli, A Eydi, IN Kamalabadi Computers & Industrial Engineering 119, 233-246, 2018 | 167 | 2018 |
Joint control of inventory and its pricing for non-instantaneously deteriorating items under permissible delay in payments and partial backlogging R Maihami, I Nakhai Kamalabadi Mathematical and Computer Modelling 55 (5), 1722-1733, 2012 | 159 | 2012 |
A novel genetic algorithm for solving production and transportation scheduling in a two-stage supply chain SH Zegordi, I Nakhai Kamalabadi, MA Nia Computers & Industrial Engineering 58 (3), 373-381, 2010 | 156 | 2010 |
Minimizing cycle time in a blocking flowshop I Nakhai Kamalabadi, NG Hall, C Sriskandarajah Operations Research 48 (1), 177-180, 2000 | 131 | 2000 |
Personalized recommendation of learning material using sequential pattern mining and attribute based collaborative filtering M Salehi, I Nakhai Kamalabadi, MBG Ghoushchi Education and Information Technologies, 1-23, 2012 | 115 | 2012 |
An efficient population-based simulated annealing algorithm for the multi-product multi-retailer perishable inventory routing problem H Shaabani, IN Kamalabadi Computers & Industrial Engineering 99, 189-201, 2016 | 114 | 2016 |
Hybrid recommendation approach for learning material based on sequential pattern of the accessed material and the learner’s preference tree M Salehi, IN Kamalabadi Knowledge-Based Systems 48, 57-69, 2013 | 90 | 2013 |
An effective recommendation framework for personal learning environments using a learner preference tree and a GA M Salehi, IN Kamalabadi, MBG Ghoushchi IEEE Transactions on learning technologies 6 (4), 350-363, 2013 | 74 | 2013 |
Simultaneous coordination of order quantity and reorder point in a two-stage supply chain SK Chaharsooghi, J Heydari, IN Kamalabadi Computers & Operations Research 38 (12), 1667-1677, 2011 | 66 | 2011 |
A reliability/availability approach to joint production and maintenance scheduling with multiple preventive maintenance services H Mokhtari, A Mozdgir, I Nakhai Kamalabadi International Journal of Production Research 50 (20), 5906-5925, 2012 | 57 | 2012 |
A multi-objective flow shop scheduling with resource-dependent processing times: trade-off between makespan and cost of resources H Mokhtari, I Nakhai Kamalabadi, A Cheraghalikhani International Journal of Production Research 49 (19), 5851-5875, 2011 | 57 | 2011 |
Research on computational intelligence algorithms with adaptive learning approach for scheduling problems with batch processing machines A Noroozi, H Mokhtari, I Nakhai Kamalabadi Neurocomputing 101, 190-203, 2013 | 50 | 2013 |
Production scheduling with outsourcing scenarios: a mixed integer programming and efficient solution procedure H Mokhtari, I Nakhai Kamalabadi, MR Amin-Naseri International Journal of Production Research 50 (19), 5372-5395, 2012 | 48 | 2012 |
Scheduling with an outsourcing option on both manufacturer and subcontractors H Mokhtari, I Nakhai Kamalabadi Computers & Operations Research 40 (5), 1234-1242, 2013 | 47 | 2013 |
Inventory control with deteriorating items: A state-of-the-art literature review N Khanlarzade, B Yegane, I Nakhai Kamalabadi, H Farughi International Journal of Industrial Engineering Computations 5 (2), 179-198, 2014 | 45 | 2014 |
A robust scheduling of projects with time, cost, and quality considerations A Salmasnia, H Mokhtari, I Nakhai Kamlabadi The International Journal of Advanced Manufacturing Technology 60 (5-8), 631-642, 2012 | 41 | 2012 |
A model for distribution centers location-routing problem on a multimodal transportation network with a meta-heuristic solving approach S Fazayeli, A Eydi, IN Kamalabadi Journal of Industrial Engineering International 14, 327-342, 2018 | 33 | 2018 |
Production capacity planning and scheduling in a no-wait environment with controllable processing times: An integrated modeling approach H Mokhtari, I Nakhai Kamalabadi, SH Zegordi Expert Systems with Applications 38 (10), 12630-12642, 2011 | 28 | 2011 |
JOINT PRICING AND REPLENISHMENT DECISIONS FOR NON-INSTANTANEOUS DETERIORATING ITEMS WITH PARTIAL BACKLOGGING, INFLATION-AND SELLING PRICE-DEPENDENT DEMAND AND CUSTOMER RETURNS M Ghoreishi, A Mirzazadeh, GW Weber, I Nakhai Kamalabadi MANAGEMENT 11 (3), 933-949, 2015 | 27 | 2015 |