Optimal logistics planning for modular construction using two-stage stochastic programming PY Hsu, P Angeloudis, M Aurisicchio Automation in construction 94, 47-61, 2018 | 196 | 2018 |
Risk-averse supply chain for modular construction projects PY Hsu, M Aurisicchio, P Angeloudis Automation in Construction 106, 102898, 2019 | 110 | 2019 |
Applying building information modeling to integrate schedule and cost for establishing construction progress curves KC Wang, WC Wang, HH Wang, PY Hsu, WH Wu, CJ Kung Automation in construction 72, 397-410, 2016 | 88 | 2016 |
Investigating schedule deviation in construction projects through root cause analysis PY Hsu, M Aurisicchio, P Angeloudis Procedia computer science 121, 732-739, 2017 | 45 | 2017 |
Understanding and visualizing schedule deviations in construction projects using fault tree analysis PY Hsu, M Aurisicchio, P Angeloudis, J Whyte Engineering, Construction and Architectural Management 27 (9), 2501-2522, 2020 | 27 | 2020 |
Endogenous stochastic optimisation for relief distribution assisted with unmanned aerial vehicles J Escribano Macias, N Goldbeck, PY Hsu, P Angeloudis, W Ochieng Or Spectrum 42, 1089-1125, 2020 | 25 | 2020 |
Optimal logistics planning for modular construction using multi-stage stochastic programming PY Hsu, M Aurisicchio, P Angeloudis Transportation Research Procedia 46, 245-252, 2020 | 20 | 2020 |
Establishing outsourcing and supply chain plans for prefabricated construction projects under uncertain productivity PY Hsu, M Aurisicchio, P Angeloudis International Conference on Computational Logistics, 529-543, 2017 | 18 | 2017 |
On the selection of charging facility locations for EV-based ride-hailing services: A computational case study E Anastasiadis, P Angeloudis, D Ainalis, Q Ye, PY Hsu, R Karamanis, ... Sustainability 13 (1), 168, 2020 | 15 | 2020 |
Supply chain design for modular construction projects PY Hsu, M Aurisicchio, P Angeloudis 25th Annual Conference of the International Group for Lean Construction …, 2017 | 8 | 2017 |
Establishing engineering S-curves to evaluate supervision engineer allocations for highway construction projects SH Wang, WC Wang, PY Hsu, CH Chen, KC Wang Journal of Civil Engineering and Management 22 (7), 890-902, 2016 | 6 | 2016 |
A bilevel optimisation model for the selection of parking and charging facilities for EV-based ride-hailing services E Anastasiadis, P Angeloudis, D Ainalis, Q Ye, PY Hsu | 1 | 2019 |
Establishing construction scheduling progress curve based on buidling information modeling quantity takeoffs KC Wang, WH Wu, PY Hsu, AA Gansonre, WC Wang, CJ Kung 2015 10th International Joint Conference on Software Technologies (ICSOFT) 1 …, 2015 | | 2015 |