Optimization approaches for civil applications of unmanned aerial vehicles (UAVs) or aerial drones: A survey A Otto, N Agatz, J Campbell, B Golden, E Pesch Networks 72 (4), 411-458, 2018 | 928 | 2018 |
Incorporating ergonomic risks into assembly line balancing A Otto, A Scholl European journal of operational research 212 (2), 277-286, 2011 | 302 | 2011 |
Systematic data generation and test design for solution algorithms on the example of SALBPGen for assembly line balancing A Otto, C Otto, A Scholl European Journal of Operational Research 228 (1), 33-45, 2013 | 201 | 2013 |
Reducing physical ergonomic risks at assembly lines by line balancing and job rotation: A survey A Otto, O Battaïa Computers & Industrial Engineering 111, 467-480, 2017 | 198 | 2017 |
Reducing ergonomic risks by job rotation scheduling A Otto, A Scholl OR spectrum 35, 711-733, 2013 | 110 | 2013 |
Preventing ergonomic risks with integrated planning on assembly line balancing and parts feeding D Battini, M Calzavara, A Otto, F Sgarbossa International Journal of Production Research 55 (24), 7452-7472, 2017 | 103 | 2017 |
Ergonomic workplace design in the fast pick area A Otto, N Boysen, A Scholl, R Walter Or Spectrum 39, 945-975, 2017 | 74 | 2017 |
How to design effective priority rules: Example of simple assembly line balancing A Otto, C Otto Computers & Industrial Engineering 69, 43-52, 2014 | 71 | 2014 |
Future trends in management and operation of assembly systems: from customized assembly systems to cyber-physical systems O Battaïa, A Otto, F Sgarbossa, E Pesch Omega 78, 1-4, 2018 | 65 | 2018 |
The integrated assembly line balancing and parts feeding problem with ergonomics considerations D Battini, M Calzavara, A Otto, F Sgarbossa IFAC-PapersOnLine 49 (12), 191-196, 2016 | 60 | 2016 |
Extending assembly line balancing problem by incorporating learning effects C Otto, A Otto International Journal of Production Research 52 (24), 7193-7208, 2014 | 48 | 2014 |
Solving the single crane scheduling problem at rail transshipment yards X Li, A Otto, E Pesch Discrete Applied Mathematics 264, 134-147, 2019 | 29 | 2019 |
Shunting operations at flat yards: retrieving freight railcars from storage tracks F Jaehn, A Otto, K Seifried OR Spectrum 40 (2), 367-393, 2018 | 29 | 2018 |
Multiple-source learning precedence graph concept for the automotive industry C Otto, A Otto European Journal of Operational Research 234 (1), 253-265, 2014 | 21 | 2014 |
Two-way bounded dynamic programming approach for operations planning in transshipment yards A Otto, X Li, E Pesch Transportation Science 51 (1), 325-342, 2017 | 20 | 2017 |
SALBPGen-A systematic data generator for (simple) assembly line balancing A Otto, C Otto, A Scholl Friedrich Schiller University Jena, School of Economics and Business …, 2011 | 18 | 2011 |
Product sequencing in multiple-piece-flow assembly lines A Otto, X Li Omega 91, 102055, 2020 | 16 | 2020 |
Operation of shunting yards: train-to-yard assignment problem A Otto, E Pesch Journal of Business Economics 87 (4), 465-486, 2017 | 11 | 2017 |
Rail platooning: Scheduling trains along a rail corridor with rapid-shunting facilities S Schwerdfeger, A Otto, N Boysen European Journal of Operational Research 294 (2), 760-778, 2021 | 10 | 2021 |
Scheduling in manufacturing with transportation: Classification and solution techniques A Hosseini, A Otto, E Pesch European Journal of Operational Research 315 (3), 821-843, 2024 | 7 | 2024 |