Optimal preventive maintenance for a two dimensional lease contract BP Iskandar, H Husniah Computers & Industrial Engineering, 2017 | 53 | 2017 |
Maintenance service contracts for equipment sold with two dimensional warranties BP Iskandar, H Husniah, US Pasaribu Quality technology & quantitative management 11 (3), 321-333, 2014 | 40 | 2014 |
Pricing critical illness insurance premiums using multiple state continous markov chain model US Pasaribu, H Husniah, RRKN Sari, AR Yanti Journal of Physics: Conference Series 1366 (1), 012112, 2019 | 15 | 2019 |
The optimal strategy of wolbachia-infected mosquitoes release program: An application of control theory in controlling dengue disease AK Supriatna, N Anggriani, H Husniah 2016 International Conference on Instrumentation, Control and Automation …, 2016 | 15 | 2016 |
Optimal number of fishing fleet for a sustainable fishery industry with a generalized logistic production function H Husniah, AK Supriatna 2015 International Conference on Industrial Engineering and Systems …, 2015 | 15 | 2015 |
A decision support system for estimating growth parameters of commercial fish stock in fisheries industries AK Supriatna, AP Ramadhan, H Husniah Procedia Computer Science 59, 331-339, 2015 | 15 | 2015 |
Analisis Kegagalan Operasional Mesin Chiller dengan Metoda FTA dan FMEA A Susilo, RI Rohimat, H Husniah Integrasi: Jurnal Ilmiah Teknik Industri 4 (2), 19-29, 2019 | 14 | 2019 |
Marine biological metapopulation with coupled logistic growth functions: The MSY and quasi MSY H Husniah, AK Supriatna AIP Conference Proceedings 1587 (1), 51-56, 2014 | 14 | 2014 |
Sustainable harvesting strategy for natural resources having a coupled Gompertz production function AK Supriatna, H Husniah, I Behavior, FL Gaol Interdisciplinary Behavior and Social Sciences-Proceedings of the 3rd …, 2015 | 13 | 2015 |
Performance-based maintenance contract for equipments used in mining industry H Husniah, US Pasaribu, A Cakravastia, BP Iskandar 2014 IEEE international conference on management of innovation and …, 2014 | 13 | 2014 |
Warranty and maintenance service contracts for repairable products BP Iskandar, NF Sa'idah, US Pasaribu, A Cakravastia, H Husniah Alexandria Engineering Journal 61 (12), 10819-10835, 2022 | 12 | 2022 |
Multi-period lease contract for remanufactured products H Husniah, US Pasaribu, BP Iskandar Alexandria Engineering Journal 60 (2), 2279-2289, 2021 | 11 | 2021 |
Warranty cost analysis for a multi-component product protected by lemon laws H Husniah, US Pasaribu, BP Iskandar IOP conference series: materials science and engineering 1003 (1), 012110, 2020 | 11 | 2020 |
Condition-based maintenance policy for a leased reman product H Husniah, US Pasaribu, R Wangsaputra, BP Iskandar Heliyon 7 (4), 2021 | 10 | 2021 |
System dynamic approach in managing complex biological resources AK Supriatna, H Husniah, N Anggriani ARPN Journal of Engineering and Applied Sciences 10 (4), 1685-1690, 2015 | 10 | 2015 |
PERFORMANCED BASED TWO MAINTENANCE CONTRACTS FOR EQUIPMENT SOLD WITH TWO DIMENSIONAL WARRANTIES BP Iskandar, US Pasaribu, H Husniah | 10 | 2013 |
Performance-based maintenance contract for a fleet of dump trucks used in mining industry BP Iskandar, A Cakravastia, US Pasaribu, H Husniah 2014 2nd International Conference on Technology, Informatics, Management …, 2014 | 9 | 2014 |
Optimal lease contract for remanufactured equipment BP Iskandar, R Wangsaputra, US Pasaribu, H Husniah IOP Conference Series: Materials Science and Engineering 319 (1), 012070, 2018 | 8 | 2018 |
SEIR mathematical model of convalescent plasma transfusion to reduce COVID-19 disease transmission H Husniah, R Ruhanda, AK Supriatna, MHA Biswas Mathematics 9 (22), 2857, 2021 | 7 | 2021 |
Analisis Perhitungan Overall Equipment Effectiveness Guna Mengurangi Six Big Losses dan Upaya Perbaikan Dengan Pendekatan Kaizen 5S RRD Rahayu, H Husniah, L Herdiani Jurnal Tiarsie 17 (2), 53-58, 2020 | 7 | 2020 |