Comparative evaluation of MILP flowshop models EF Stafford Jr, FT Tseng, JND Gupta Journal of the Operational Research Society 56 (1), 88-101, 2005 | 123 | 2005 |
Nurse staffing is an important strategy to prevent medication errors in community hospitals KH Frith, EF Anderson, F Tseng, EA Fong Nursing Economics 30 (5), 288, 2012 | 105 | 2012 |
On the Srikar-Ghosh MILP model for the iVx M SDST flowshop problem EFS Jr, FANT TSENG THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 28 (10), 1817-1830, 1990 | 86 | 1990 |
An empirical analysis of integer programming formulations for the permutation flowshop FT Tseng, EF Stafford Jr, JND Gupta Omega 32 (4), 285-293, 2004 | 83 | 2004 |
Two models for a family of flowshop sequencing problems EF Stafford Jr, FT Tseng European Journal of Operational Research 142 (2), 282-293, 2002 | 79 | 2002 |
Effects of nurse staffing on hospital-acquired conditions and length of stay in community hospitals KH Frith, EF Anderson, B Caspers, F Tseng, K Sanford, NG Hoyt, K Moore Quality Management in Healthcare 19 (2), 147-155, 2010 | 71 | 2010 |
Two MILP models for the N× M SDST flowshop sequencing problem FT Tseng, EF Stafford Jr International Journal of Production Research 39 (8), 1777-1809, 2001 | 50 | 2001 |
Military supply chains and closed-loop systems: resource allocation and incentives in supply sourcing and supply chain design A Wilhite, L Burns, R Patnayakuni, F Tseng International Journal of Production Research 52 (7), 1926-1939, 2014 | 45 | 2014 |
New MILP models for the permutation flowshop problem FT Tseng, EF Stafford Jr Journal of the Operational Research Society 59 (10), 1373-1386, 2008 | 45 | 2008 |
Modelling complex manufacturing systems using discrete event simulation BJ Schroer, FT Tseng Computers & industrial engineering 14 (4), 455-464, 1988 | 36 | 1988 |
A decomposition of the matroids with the max-flow min-cut property FT Tseng, K Truemper Discrete Applied Mathematics 15 (2-3), 329-364, 1986 | 32 | 1986 |
A penalty-based heuristic algorithm for the permutation flowshop scheduling problem with sequence-dependent set-up times FT Tseng, JND Gupta, EF Stafford Jr Journal of the Operational Research Society 57 (5), 541-551, 2006 | 21 | 2006 |
An intelligent assistant for manufacturing system simulation BJ SCHROER, FANT TSENG THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 27 (10), 1665-1683, 1989 | 13 | 1989 |
Global network analysis in a military supply chain: using a systems based approach to develop a next-generation end-to-end supply chain performance measurement and prediction … L Burns, F Tseng, D Berkowitz Proceedings of the 2010 Cambridge International Manufacturing Symposium, 23-24, 2010 | 11 | 2010 |
Modeling complex manufacturing systems using simulation BJ Schroer, FT Tseng Proceedings of the 19th conference on Winter simulation, 677-682, 1987 | 9 | 1987 |
On ‘redundant’constraints in Stafford's MILP model for the flowshop problem EF Stafford, FT Tseng Journal of the Operational Research Society 54 (10), 1102-1105, 2003 | 7 | 2003 |
Two MILP models for the SSIST flowshop sequencing problem EF Stafford, FT Tseng DSI National Meetings, 17-20, 2001 | 5 | 2001 |
Automatic programming assistant for network simulation models FT Tseng, SX Zhang, JW Wolfsberger Simulation Conference Proceedings, 1988 Winter, 240-245, 1988 | 4 | 1988 |
Development of a new model for the flowshop problem MM Mashhadi, EF Stafford, FT Tseng Industrial Engineering and Engineering Management, 2007 IEEE International …, 2007 | 3 | 2007 |
The M× N Flowshop Problem with Separable, Sequence-independent Setup Times EF Stafford Jr, FT Tseng International Journal of Operations Research 3, 155-172, 2006 | 3 | 2006 |