Folgen
Scott J Mason
Scott J Mason
Bestätigte E-Mail-Adresse bei amazon.com - Startseite
Titel
Zitiert von
Zitiert von
Jahr
A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations
L Mönch, JW Fowler, S Dauzère-Pérès, SJ Mason, O Rose
Journal of scheduling 14, 583-599, 2011
4622011
Integrating the warehousing and transportation functions of the supply chain
SJ Mason, PM Ribera, JA Farris, RG Kirk
Transportation Research Part E: Logistics and Transportation Review 39 (2 …, 2003
3672003
Production planning and control for semiconductor wafer fabrication facilities: modeling, analysis, and systems
L Mönch, JW Fowler, SJ Mason
Springer Science & Business Media, 2012
3432012
A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops
SJ Mason, JW Fowler, W Matthew Carlyle
Journal of Scheduling 5 (3), 247-262, 2002
2772002
A multi-period optimization model for the deployment of public electric vehicle charging stations on network
S Li, Y Huang, SJ Mason
Transportation Research Part C: Emerging Technologies 65, 128-143, 2016
2252016
Improving electronics manufacturing supply chain agility through outsourcing
SJ Mason, MH Cole, BT Ulrey, L Yan
International Journal of Physical Distribution & Logistics Management 32 (7 …, 2002
2002002
Evaluation of mixed integer programming formulations for non-preemptive parallel machine scheduling problems
Y Unlu, SJ Mason
Computers & Industrial Engineering 58 (4), 785-800, 2010
1762010
Multiple-objective analysis of integrated relief supply and network restoration in humanitarian logistics operations
K Ransikarbum, SJ Mason
International Journal of Production Research 54 (1), 49-68, 2016
1702016
Goal programming-based post-disaster decision making for integrated relief distribution and early-stage network restoration
K Ransikarbum, SJ Mason
International Journal of Production Economics 182, 324-341, 2016
1592016
Racial and ethnic differences in the polycystic ovary syndrome metabolic phenotype
L Engmann, S Jin, F Sun, RS Legro, AJ Polotsky, KR Hansen, C Coutifaris, ...
American journal of obstetrics and gynecology 216 (5), 493. e1-493. e13, 2017
1562017
Workload control in the semiconductor industry
JW Fowler, GL Hogg, SJ Mason
Production Planning & Control 13 (7), 568-578, 2002
1322002
Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting
J Cheng, J Fowler, K Kempf, S Mason
Computers & Operations Research 53, 275-287, 2015
1092015
Operational planning and control of semiconductor wafer production
JND Gupta, R Ruiz, JW Fowler, SJ Mason
Production Planning & Control 17 (7), 639-647, 2006
1072006
A multi-objective optimization model for designing resilient supply chain networks
JT Margolis, KM Sullivan, SJ Mason, M Magagnotti
International Journal of Production Economics 204, 174-185, 2018
1052018
Major depression, antidepressant use, and male and female fertility
EA Evans-Hoeker, E Eisenberg, MP Diamond, RS Legro, R Alvero, ...
Fertility and sterility 109 (5), 879-887, 2018
892018
Vulnerability assessment and re-routing of freight trains under disruptions: A coal supply chain network application
R Gedik, H Medal, C Rainwater, EA Pohl, SJ Mason
Transportation Research Part E: Logistics and Transportation Review 71, 45-57, 2014
892014
Rescheduling strategies for minimizing total weighted tardiness in complex job shops
SJ Mason, S Jin, CM Wessels
International Journal of Production Research 42 (3), 613-628, 2004
882004
Bee colony optimisation algorithm with big valley landscape exploitation for job shop scheduling problems
LP Wong, CY Puan, MYH Low, YW Wong, CS Chong
International Journal of Bio-Inspired Computation 2 (2), 85-99, 2010
812010
Using simulation-based scheduling to maximize demand fulfillment in a semiconductor assembly facility
J Potoradi, OS Boon, SJ Mason
Proceedings of the Winter Simulation Conference 2, 1857-1861, 2002
812002
Parallel machine scheduling subject to auxiliary resource constraints
E Cakici, SJ Mason
Production Planning and Control 18 (3), 217-225, 2007
742007
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20