Folgen
Faizul Azli Mohd Rahim
Faizul Azli Mohd Rahim
Faculty of Built Environment, Universiti Malaya
Bestätigte E-Mail-Adresse bei um.edu.my
Titel
Zitiert von
Zitiert von
Jahr
The challenge of labour shortage for sustainable construction
FAM Rahim, NSM Yusoff, W Chen, N Zainon, S Yusoff, R Deraman
Planning Malaysia, 2016
732016
Malaysian affordability housing policies revisited
D Samad, N Zainon, FAM Rahim, E Lou
Open House International 42 (1), 44-51, 2017
702017
Factors affecting the demand of affordable housing among the middle-income groups in Klang Valley Malaysia
N Zainon, FA Mohd-Rahim, S Sulaiman, SB Abd-Karim, A Hamzah
Journal of Design and Built Environment, 1-10, 2017
692017
Capability of building information modeling application in quantity surveying practice
WP Fung, H Salleh, FAM Rahim
Journal of Surveying, Construction and Property 5 (1), 1-13, 2014
502014
Reducing failures in software development projects: effectiveness of risk mitigation strategies
H Abdul-Rahman, FA Mohd-Rahim, W Chen
Journal of Risk Research 15 (4), 417-433, 2012
442012
Fuzzy mapping on psychological disorders in construction management
C Wang, FA Mohd-Rahim, YY Chan, H Abdul-Rahman
Journal of Construction Engineering and Management 143 (2), 04016094, 2017
422017
The rise of BIM in Malaysia and its impact towards quantity surveying practices
N Zainon, FA Mohd-Rahim, H Salleh
MATEC Web of Conferences 66, 00060, 2016
392016
The relationship of Building Information Modeling (BIM) capability in quantity surveying practice and project performance
PF Wong, H Salleh, FA Rahim
International Journal of Civil, Environmental, Structural, Construction and …, 2014
382014
Factors affecting the ownership of low-cost housing for socio-economic development in Malaysia
FA Mohd-Rahim, N Zainon, S Sulaiman, E Lou, NH Zulkifli
Journal of Building Performance 10 (1), 1-16, 2019
372019
Sustainable construction through life cycle costing
FA Rahim, SA Muzaffar, NSM Yusoff, N Zainon, C Wang
Journal of building performance 5 (1), 2014
332014
Integrating building information modelling (Bim) and sustainability to greening existing building: Potentials in malaysian construction industry
NS Zulkefli, FA Mohd-Rahim, N Zainon
International journal of sustainable construction engineering and technology …, 2020
302020
A relationship framework for building information modeling (BIM) capability in quantity surveying practice and project performance
PF Wong, H Salleh, FAM Rahim
Informes de la Construcción 67 (540), e119, 2015
272015
Technology awareness of artificial intelligence (AI) application for risk analysis in construction projects
AA Basaif, AM Alashwal, FA Mohd-Rahim, SBA Karim, SC Loo
Malaysian Construction Research Journal 9 (1), 182-195, 2020
262020
Risk in implementing building information modelling (BIM) in Malaysia construction industry: A review
IAM Ya’acob, FAM Rahim, N Zainon
E3S Web of Conferences 65, 03002, 2018
262018
Green construction project: A critical review of retrofitting awarded green buildings in Malaysia
F Mohd-Rahim, A Pirotti, A Keshavarzsaleh, NI Zainon, N Zakaria
Mohd-Rahim, FA, Pirotti, A., Keshavarzsaleh, A., Zainon, N., & Zakaria, 11-26, 2017
242017
Conceptualising and responding to risk in IT projects
D Brookfield, D Fischbacher-Smith, F Mohd-Rahim, H Boussabaine
Risk Management 16, 195-230, 2014
232014
The information technology application change trend: Its implications for the construction industry
N Zainon, FA Rahim, H Salleh
Journal of Surveying, Construction and Property 2 (2), 2011
222011
Effective factors on project success in Malaysian construction industry
A Pirotti, A Keshavarzsaleh, F Mohd-Rahim, N Zakaria
Journal of Engineering, Project, and Production Management 10 (1), 1-10, 2020
212020
Project life cycle risk of public-private partnership (PPP) projects for construction sustainability
FA Mohd-Rahim, MS Abd-Rahim, N Zainon, LS Chuing, Z Abd-Samad
Journal of Design and Built Environment, 39-53, 2018
192018
A study on quality management during the pre-construction stage of design-and-build projects
H Abdul-Rahman, FAM Rahim, MS Mohd
CME 25 Conference Construction Management and Economics 753, 2007
182007
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20