متابعة
Mustafa Kumral
Mustafa Kumral
بريد إلكتروني تم التحقق منه على mcgill.ca
عنوان
عدد مرات الاقتباسات
عدد مرات الاقتباسات
السنة
Predicting elastic properties of intact rocks from index tests using multiple regression modelling
M Karakus, M Kumral, O Kilic
International Journal of Rock Mechanics and Mining Sciences 42 (2), 323-330, 2005
1392005
Organization: A new focus on mine safety improvement in a complex operational and business environment
D Komljenovic, G Loiselle, M Kumral
International Journal of Mining Science and Technology 27 (4), 617-625, 2017
1312017
A simulated annealing approach to mine production scheduling
M Kumral, PA Dowd
Journal of the Operational Research Society 56 (8), 922-930, 2005
1212005
Simulation-based optimization of truck-shovel material handling systems in multi-pit surface mines
B Ozdemir, M Kumral
Simulation Modelling Practice and Theory 95, 36-48, 2019
922019
Reliability effect on energy consumption and greenhouse gas emissions of mining hauling fleet towards sustainable mining
S Peralta, AP Sasmito, M Kumral
Journal of Sustainable Mining 15 (3), 85-94, 2016
732016
Optimizing ore–waste discrimination and block sequencing through simulated annealing
M Kumral
Applied Soft Computing 13 (8), 3737-3744, 2013
662013
A system-wide approach to minimize the operational cost of bench production in open-cast mining operations
B Ozdemir, M Kumral
International Journal of Coal Science & Technology 6 (1), 84-94, 2019
632019
Application of chance-constrained programming based on multi-objective simulated annealing to solve a mineral blending problem
M Kumral
Engineering Optimization 35 (6), 661-673, 2003
592003
Optimal inspection and preventive maintenance scheduling of mining equipment
E Angeles, M Kumral
Journal of Failure Analysis and Prevention 20 (4), 1408-1416, 2020
522020
Robust stochastic mine production scheduling
M Kumral
Engineering Optimization 42 (6), 567-579, 2010
512010
Game theory for analyzing and improving environmental management in the mining industry
BC Collins, M Kumral
Resources Policy 69, 101860, 2020
502020
Production planning of mines: Optimisation of block sequencing and destination
M Kumral
International Journal of Mining, Reclamation and Environment 26 (2), 93-103, 2012
492012
Mine design selection under uncertainty
SA Abdel Sabour, RG Dimitrakopoulos, M Kumral
Mining Technology 117 (2), 53-64, 2008
482008
Underground mine planning: stope layout optimisation under grade uncertainty using genetic algorithms
ME Villalba Matamoros, M Kumral
International Journal of Mining, Reclamation and Environment 33 (5), 353-370, 2019
472019
Optimizing ore–waste dig-limits as part of operational mine planning through genetic algorithms
JR Ruiseco, J Williams, M Kumral
Natural Resources Research 25, 473-485, 2016
452016
Short-term mine production scheduling for industrial minerals using multi-objective simulated annealing
M Kumral, P Dowd
APCOM 2002: 30 th International Symposium on the Application of Computers …, 2002
452002
Cost analysis of material handling systems in open pit mining: Case study on an iron ore prefeasibility study
M de Werk, B Ozdemir, B Ragoub, T Dunbrack, M Kumral
The Engineering Economist 62 (4), 369-386, 2017
442017
Incorporating geo-metallurgical information into mine production scheduling
M Kumral
Journal of the Operational Research Society 62 (1), 60-68, 2011
412011
Geostatistical modeling of spatial variability of SPT data for a borax stockpile site
H Basarir, M Kumral, C Karpuz, L Tutluoglu
Engineering Geology 114 (3-4), 154-163, 2010
372010
Reliability-based optimisation of a mine production system using genetic algorithms
M Kumral
Journal of Loss Prevention in the Process Industries 18 (3), 186-189, 2005
372005
يتعذر على النظام إجراء العملية في الوقت الحالي. عاود المحاولة لاحقًا.
مقالات 1–20