متابعة
Wencheng Guo
Wencheng Guo
Postdoctoral Research Fellow, Royal Institute of Technology (KTH)
بريد إلكتروني تم التحقق منه على whu.edu.cn
عنوان
عدد مرات الاقتباسات
عدد مرات الاقتباسات
السنة
Nonlinear modeling and stability analysis of hydro-turbine governing system with sloping ceiling tailrace tunnel under load disturbance
W Guo, J Yang, M Wang, X Lai
Energy Conversion and Management 106, 127-138, 2015
1232015
A mathematical model and its application for hydro power units under different operating conditions
W Yang, J Yang, W Guo, W Zeng, C Wang, L Saarinen, P Norrlund
Energies 8 (9), 10260-10275, 2015
942015
Stability performance for primary frequency regulation of hydro-turbine governing system with surge tank
W Guo, J Yang
Applied Mathematical Modelling 54, 446-466, 2018
862018
Regulation quality for frequency response of turbine regulating system of isolated hydroelectric power plant with surge tank
W Guo, J Yang, W Yang, J Chen, Y Teng
International Journal of Electrical Power & Energy Systems 73, 528-538, 2015
832015
Wear and tear on hydro power turbines–Influence from primary frequency control
W Yang, P Norrlund, L Saarinen, J Yang, W Guo, W Zeng
Renewable energy 87, 88-95, 2016
752016
Runaway instability of pump-turbines in S-shaped regions considering water compressibility
W Zeng, J Yang, W Guo
Journal of Fluids Engineering 137 (5), 051401, 2015
752015
Hydropower system operation stability considering the coupling effect of water potential energy in surge tank and power grid
W Guo, Z Peng
Renewable energy 134, 846-861, 2019
702019
Modeling and dynamic response control for primary frequency regulation of hydro-turbine governing system with surge tank
W Guo, J Yang
Renewable Energy 121, 173-187, 2018
692018
Response time for primary frequency control of hydroelectric generating unit
W Yang, J Yang, W Guo, P Norrlund
International Journal of Electrical Power & Energy Systems 74, 16-24, 2016
592016
Hopf bifurcation control of hydro-turbine governing system with sloping ceiling tailrace tunnel using nonlinear state feedback
W Guo, J Yang
Chaos, Solitons & Fractals 104, 426-434, 2017
582017
A review of the transient process and control for a hydropower station with a super long headrace tunnel
W Guo, D Zhu
Energies 11 (11), 2994, 2018
572018
Nonlinear modeling and dynamic control of hydro-turbine governing system with upstream surge tank and sloping ceiling tailrace tunnel
W Guo, J Yang, J Chen, M Wang
Nonlinear Dynamics 84 (3), 1383-1397, 2016
552016
Stability and dynamic characteristics of the nonlinear coupling system of hydropower station and power grid
X Lai, C Li, W Guo, Y Xu, Y Li
Communications in Nonlinear Science and Numerical Simulation 79, 104919, 2019
542019
Saturation characteristics for stability of hydro-turbine governing system with surge tank
Z Peng, W Guo
Renewable Energy 131, 318-332, 2019
522019
Robust H∞ control for hydro-turbine governing system of hydropower plant with super long headrace tunnel
F Qu, W Guo
International Journal of Electrical Power & Energy Systems 124, 106336, 2021
482021
Setting condition of surge tank based on stability of hydro-turbine governing system considering nonlinear penstock head loss
D Zhu, W Guo
International Journal of Electrical Power & Energy Systems 113, 372-382, 2019
462019
Time response of the frequency of hydroelectric generator unit with surge tank under isolated operation based on turbine regulating modes
W Guo, J Yang, J Chen, W Yang, Y Teng, W Zeng
Electric Power Components and Systems 43 (20), 2341-2355, 2015
462015
Surge wave characteristics for hydropower station with upstream series double surge tanks in load rejection transient
W Guo, J Yang, Y Teng
Renewable Energy 108, 488-501, 2017
452017
Multi-frequency dynamic performance of hydropower plant under coupling effect of power grid and turbine regulating system with surge tank
Y Liu, W Guo
Renewable Energy 171, 557-581, 2021
412021
Optimal control of water level oscillations in surge tank of hydropower station with long headrace tunnel under combined operating conditions
W Guo, B Wang, J Yang, Y Xue
Applied Mathematical Modelling 47, 260-275, 2017
412017
يتعذر على النظام إجراء العملية في الوقت الحالي. عاود المحاولة لاحقًا.
مقالات 1–20