متابعة
M S Liew
M S Liew
University of Nottingham
بريد إلكتروني تم التحقق منه على nottingham.edu.my
عنوان
عدد مرات الاقتباسات
عدد مرات الاقتباسات
السنة
Industrial Revolution 4.0 in the construction industry: Challenges and opportunities for stakeholders
WS Alaloul, MS Liew, NAWA Zawawi, IB Kennedy
Ain shams engineering journal 11 (1), 225-230, 2020
5992020
Malaysian construction sector and Malaysia vision 2020: Developed nation status
RA Khan, MS Liew, ZB Ghazali
Procedia-social and behavioral sciences 109, 507-513, 2014
3052014
Incorporation of waste materials in the manufacture of masonry bricks: An update review
A Al-Fakih, BS Mohammed, MS Liew, E Nikbakht
Journal of Building Engineering 21, 37-54, 2019
2602019
Impact of inflation rate on construction projects budget: A review
MA Musarat, WS Alaloul, MS Liew
Ain Shams Engineering Journal 12 (1), 407-414, 2021
2582021
Industry revolution IR 4.0: future opportunities and challenges in construction industry
WS Alaloul, MS Liew, NAWA Zawawi, BS Mohammed
MATEC web of conferences 203, 02010, 2018
2192018
Criteria for the selection of sustainable onsite construction equipment
M Waris, MS Liew, MF Khamidi, A Idrus
International Journal of Sustainable Built Environment 3 (1), 96-110, 2014
1912014
Identification of coordination factors affecting building projects performance
WS Alaloul, MS Liew, NAWA Zawawi
Alexandria Engineering Journal 55 (3), 2689-2698, 2016
1812016
Mechanical properties and performance of high volume fly ash roller compacted concrete containing crumb rubber and nano silica
M Adamu, BS Mohammed, MS Liew
Construction and Building Materials 171, 521-538, 2018
1762018
Properties of nano-silica modified pervious concrete
BS Mohammed, MS Liew, WS Alaloul, VC Khed, CY Hoong, M Adamu
Case studies in construction materials 8, 409-422, 2018
1282018
Mechanical and microstructural properties of high calcium fly ash one-part geopolymer cement made with granular activator
BS Mohammed, S Haruna, MMA Wahab, MS Liew, A Haruna
Heliyon 5 (9), 2019
1262019
Critical success factors influencing total quality management in industrialised building system: A case of malaysian construction industry
AM Alawag, WS Alaloul, MS Liew, MA Musarat, AO Baarimah, S Saad, ...
Ain Shams Engineering Journal 14 (2), 101877, 2023
1162023
Development of rubberized geopolymer interlocking bricks
BS Mohammed, MS Liew, WS Alaloul, A Al-Fakih, W Ibrahim, M Adamu
Case studies in construction materials 8, 401-408, 2018
1142018
Investigating the impact of inflation on building materials prices in construction industry
MA Musarat, WS Alaloul, MS Liew, A Maqsoom, AH Qureshi
Journal of Building Engineering 32, 101485, 2020
1102020
Optimization of hybrid fibres in engineered cementitious composites
BS Mohammed, VC Khed, MS Liew
Construction and Building Materials 190, 24-37, 2018
1102018
Enhanced properties of cementitious composite tailored with graphene oxide nanomaterial-A review
A Anwar, BS Mohammed, MA Wahab, MS Liew
Developments in the Built Environment 1, 100002, 2020
1072020
Optimization and characterization of cast in-situ alkali-activated pastes by response surface methodology
BS Mohammed, S Haruna, MS Liew
Construction and Building Materials 225, 776-787, 2019
1002019
Investigating the impact of inflation on labour wages in Construction Industry of Malaysia
WS Alaloul, MA Musarat, MS Liew, AH Qureshi, A Maqsoom
Ain Shams Engineering Journal 12 (2), 1575-1582, 2021
772021
Decommissioning of offshore platform: A sustainable framework
NAWA Zawawi, MS Liew, KL Na
2012 IEEE colloquium on humanities, science and engineering (CHUSER), 26-31, 2012
712012
Evaluating the effect of crumb rubber and nano silica on the properties of high volume fly ash roller compacted concrete pavement using non-destructive techniques
BS Mohammed, M Adamu, MS Liew
Case studies in construction materials 8, 380-391, 2018
702018
An Artificial neural networks (ANN) model for evaluating construction project performance based on coordination factors
WS Alaloul, MS Liew, NA Wan Zawawi, BS Mohammed, M Adamu
Cogent Engineering 5 (1), 1507657, 2018
702018
يتعذر على النظام إجراء العملية في الوقت الحالي. عاود المحاولة لاحقًا.
مقالات 1–20